Before Using Your Fridge - Baumatic BR16.2A User Manual

Built-under larder fridge
Table of Contents

Advertisement

NOTE: BEFORE Using your BR16.2A LARDER-FRIDGE:
UPON DELIVERY:
When your Fridge has been delivered, you will need to
wait approximately 2 hours before turning it on. The fluid
of the compressor installed in the appliance will need
time to settle. PLEASE DO NOT PLUG IN ANY EARLIER
THAN THIS!
NOTE:
THERE CAN BE AN ODOUR WHEN
YOU FIRST SWITCH ON THE
APPLIANCE. IT WILL VANISH
WHEN THE UNIT STARTS
COOLING.
SITUATING YOUR FRIDGE
: DO NOT PLACE THE APPLIANCE NEAR HEAT SOURCES
CAUTION
AND FOLLOW THE INSTALLATION ADVICE SHOWN ON PAGE 15.
FOR FULL INSTALLATION ADVICE, PLEASE SEE PAGE 15
MAKE A NOTE OF THE LOCATION FOR YOUR NEW FRIDGE. MAKE SURE THAT
IT WILL FIT PROPERLY SO THAT:
1)
The doors can open freely and completely.
2)
You can access your food conveniently.
3)
There is sufficient space at the back for the cooling coils to
give off heat safely & that they do not touch the plug (see SAFETY
SECTION).
NOTE: You can reverse the swing of the door to customise the unit to
your location. Please see page 18 for details.
We recommend that you
have the Fridge delivered
near to where you plan to
install it so that this fluid
can settle.
6

Advertisement

Table of Contents
loading

Table of Contents