Stage 3: Sequence Of Operations; Supported Fonts - Cisco DMS-DMP-4300G User Manual

Digital media player device manager 5.2.x
Table of Contents

Advertisement

Concepts

Stage 3: Sequence of Operations

When errors interfere with stages 1 and 2, your DMP enters stage 3 failover. Stage 3 operations for
failover occur in a predictable sequence. Your DMP:
1.
2.
The butterfly video clip in ROM has no other purpose than stage 3 failover. You cannot change it and
you cannot delete it.
Related Topics

Supported Fonts

TVzilla supports some bitmap fonts and some TrueType fonts; it will substitute an installed font for any
unsupported font.
Other typographic representations that you might show on a DMP display, such as the opening titles for
a theatrical film, do not require that any font be installed. Similarly, when a font is embedded within a
Flash file that you show, the Flash file will load correctly even if the corresponding font is not installed
on your DMP.
See User Guide for Cisco Digital Media Manager 5.2.x on Cisco.com to learn precisely which fonts your
DMP supports.
User Guide for Cisco Digital Media Player Device Manager 5.2.x
13-4
Your DMP starts to play a video loop from ROM, which shows a butterfly beating its wings.
Playback of the video loop persists until one of the following occurs.
In DMPDM 5.2.0 to 5.2.2:
The error condition ends, which prevented
your DMP from completing stage 1
successfully. In this case, your DMP stops
playing the butterfly video and starts to play
assets from the Recovery URL.
The error condition ends, which triggered
stage 1. In this case, your DMP obtains and
plays the assets that it was scheduled
to play.
You use the "Stop All Applications"
advanced task in Cisco Digital Signs.
You restart or shut down your DMP.
Stage 1: Sequence of Operations, page 13-2
Stage 2: Sequence of Operations, page 13-3
Chapter 13
Browser Settings ('TVzilla')
In DMPDM 5.2.3
The error condition ends, which triggered
content substitution. In this case, your DMP
stops playing the butterfly video and starts
to play the assets that it was scheduled
to play.
You use the "Stop All Applications"
advanced task in Cisco Digital Signs.
You restart or shut down your DMP.
OL-15764-03

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dmp 4305gDmp 4310gDmp 4400g

Table of Contents