Table of Contents

Advertisement

Quick Links

Innova
TM
Preinstallation Manual
IGS 620, Innova
IGS 630
TM
OPERATING DOCUMENTATION
5694389-1-1EN
Revision 2

Advertisement

Table of Contents
loading

Summary of Contents for GE Innova IGS 620

  • Page 1 Innova IGS 620, Innova IGS 630 Preinstallation Manual OPERATING DOCUMENTATION 5694389-1-1EN Revision 2...
  • Page 2: Direction 5694389-1-1En, Revision

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2...
  • Page 3 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Important Information LANGUAGE ПРЕДУПРЕЖДЕНИЕ Това упътване за работа е налично само на английски език. (BG) • Ако доставчикът на услугата на клиента изиска друг език, задължение на клиента е да осигури превод. •...
  • Page 4 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 VÝSTRAHA Tento provozní návod existuje pouze v anglickém jazyce. • (CS) V případě, že externí služba zákazníkům potřebuje návod v jiném jazyce, je zajiště‐ ní překladu do odpovídajícího jazyka úkolem zákazníka. •...
  • Page 5 FIGYELMEZTETÉS Ezen karbantartási kézikönyv kizárólag angol nyelven érhető el. • (HU) Ha a vevő szolgáltatója angoltól eltérő nyelvre tart igényt, akkor a vevő felelőssége a fordítás elkészíttetése. • Ne próbálja elkezdeni használni a berendezést, amíg a karbantartási kézikönyvben leírtakat nem értelmezték.
  • Page 6 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 AÐVÖRUN Þessi þjónustuhandbók er aðeins fáanleg á ensku. • (IS) Ef að þjónustuveitandi viðskiptamanns þarfnast annas tungumáls en ensku, er það skylda viðskiptamanns að skaffa tungumálaþjónustu. • Reynið ekki að afgreiða tækið nema að þessi þjónustuhandbók hefur verið skoðuð og skilin.
  • Page 7 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 ĮSPĖJIMAS Šis eksploatavimo vadovas yra tik anglų kalba. • (LT) Jei kliento paslaugų tiekėjas reikalauja vadovo kita kalba – ne anglų, suteikti vertimo paslaugas privalo klientas. • Nemėginkite atlikti įrangos techninės priežiūros, jei neperskaitėte ar nesupratote šio eksploatavimo vadovo.
  • Page 8 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 ATENŢIE Acest manual de service este disponibil doar în limba engleză. • (RO) Dacă un furnizor de servicii pentru clienţi necesită o altă limbă decât cea engleză, este de datoria clientului să furnizeze o traducere. •...
  • Page 9 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 VARNING Den här servicehandboken finns bara tillgänglig på engelska. • (SV) Om en kunds servicetekniker har behov av ett annat språk än engelska, ansvarar kunden för att tillhandahålla översättningstjänster. •...
  • Page 10 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 This page left intentionally blank. Important Information...
  • Page 11 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Revision History Part/Rev Date Reason for Change Pages 5694389-1-1EN rev 1 November 30, 2015 Initial release of 5694389-1-1EN 5694389-1-1EN rev 2 March 10, 2016 Second release of 5694389-1-1EN Revision History...
  • Page 12 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 This page left intentionally blank. Revision History...
  • Page 13: Table Of Contents

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Table of Contents Chapter 1 GENERAL REQUIREMENTS....................21 1 Objectives & Overview........................21 1.1 Object and Scope of this manual..................21 1.2 Pre-Installation Process......................22 2 Customer Responsibilities......................23 2.1 Responsibilities of the Purchaser/Customer.................23 2.2 Equipment Classifications....................
  • Page 14 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.4.2 Step Two — Survey.....................41 3.4.3 Step Three — Check....................41 4 Product Storage and Handling Requirements................43 4.1 Product Storage and Handling limits..................43 4.2 Fluoro & 3KVA UPS Shipment Duration................45 4.2.1 Fluoro UPS (CE and UL).....................
  • Page 15 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 1.2.11 Injectors........................60 1.2.12 Fluoro UPS (Option)....................60 1.2.13 3kVA Cabinets UPS....................61 1.2.14 Touch Screen......................61 1.2.15 ECG Acquisition kit Option..................61 1.2.16 Large Display Subsystem option................62 1.3 Dimension Drawings......................63 1.4 Monitor and Monitor Suspension References..............
  • Page 16 3.2 Mounting Requirements..................... 115 3.2.1 Floor Loading and Recommended Mounting Methods..........115 3.2.2 Positioner and Table Floor Mounting.................116 3.2.3 Innova Frontal Positioner and Table Floor Preparation Kits (GE Healthcare supplied)......................126 3.2.3.1 2285048 - Base Plate Assembly...............128 3.2.3.2 2360538 – Table Add–On Kit................129 3.2.3.3 2285050 –...
  • Page 17 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.3 Ceiling Requirements......................136 3.3.1 Gantry rails........................ 136 3.3.2 Monitor Suspension Rails..................140 3.3.2.1 Reference......................140 3.3.2.2 Rail Mounting....................140 3.3.2.3 Bolt Specifications.................... 140 3.3.2.4 Rails selection....................140 3.3.3 Open Monitor suspension (option)................140 3.4 Wall Requirements......................
  • Page 18 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.1 Equipment Heat Output Tables..................157 3.2 Fluoro UPS Option......................158 3.3 Large Display Subsystem Option..................159 4 Acoustic Specifications........................161 Chapter 5 ELECTRICAL REQUIREMENTS..................163 1 Power Requirements........................163 1.1 Electrical Requirements......................163 1.1.1 Power configuration for Coolix 4100 Chillers.............164 1.1.2 Large Display Monitor System special instructions:..........
  • Page 19 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 5 X-Ray ON Lamp Distribution....................... 195 6 Ready For X-Ray Lamp.......................196 7 Door Interlocks..........................197 8 Room Speaker..........................198 9 MAC-LAB System EX........................199 10 Advantage Windows........................200 11 Injectors.............................201 11.1 Remote Injector (rack mount)................... 201 11.2 Pedestal Injector.......................201 12 Lighting Specifications.......................202 12.1 Room Light Distribution....................
  • Page 20 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 This page left intentionally blank. Table of Contents...
  • Page 21: Chapter 1 General Requirements

    This document is intended as a guide and information resource to properly plan and prepare a site for the installation of an Innova system (Innova IGS 620, Innova IGS 630). In addition, this document provides references to the pre–installation documents of the various product included with an Innova System.
  • Page 22: Pre-Installation Process

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 1.2 Pre-Installation Process ROOM LAYOUTS , ELECTRICAL CONNECTIONS , and Complete the checklists in ADDITIONAL PLANNING AIDS of this manual. They represent an important part of the pre– installation process.
  • Page 23: Customer Responsibilities

    Be sure to inform the customer that the cost of any alteration or modification not specified in the sales contract are liable to the customer. The following GE-supplied equipment must be installed by the Hospital's Contractors, per room drawings: •...
  • Page 24: Equipment Classifications

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 2.2 Equipment Classifications The following equipment classifications are applicable to the product: Classification category Equipment classification Protection against electric shock Class I. WARNING TO AVOID THE RISK OF ELECTRIC SHOCK, THIS EQUIPMENT MUST ONLY BE CONNECTED TO A SUPPLY MAINS WITH PROTECTIVE EARTH.
  • Page 25: Pre-Installation Checklist

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 2.3 Pre-Installation Checklist GE Healthcare Site Readiness Checklist GEHC Global Order # : Customer: GEHC On-site Representative : MI Supplier: Name of customer reviewed with : Lead Installer:...
  • Page 26 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Floor is clean and prepared for final floor covering. Customer has verified floor lev‐ eling meets the equipment installation drawings and PIM specs and no visible defects are observed. Gantry and table baseplate are installed prior to delivery (if applicable) Access to a working phone at the facility...
  • Page 27: Delivery Requirements

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3 Delivery Requirements 3.1 Shipping Information 3.1.1 Product Shipping Information Refer to Table 1-1. To obtain shipping information for components not specified in Table 1-1, refer to the appropriate component Pre-Installation Manual listed in Chapter 2, System Compatibility.
  • Page 28: Detail Of Innova Shipping Information

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 DIMENSIONS MILLIMETERS (INCHES) WEIGHT METHOD OF SHIP‐ PRODUCT OR COMPONENT POUNDS (KILO‐ MENT Height Length Depth GRAMS) LD suspension 36m harness 230 (9) 800 (34.5) 800 (34.5) 134 (62) On pallet LDM UPS 570 (22.4)
  • Page 29: Frontal Positioner Air Shipment

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.1.2.2 Frontal Positioner Air Shipment Illustration 1-3: Chapter 1 General Requirements...
  • Page 30: Lateral Positioner On Shipping Dolly (Longer And Shorter Dollies)

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.1.2.3 Lateral Positioner On Shipping Dolly (Longer and shorter dollies) Illustration 1-4: On Longer type dolly NOTE: The dimensions above are for shipping. When the Lateral Positioner and dolly are in rolling configuration for hospital access, the dimensions are Height : 2001 mm (78.8 in) and width : 1040 mm (41 in) 3 Delivery Requirements...
  • Page 31 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 1-5: On shorter type dolly Chapter 1 General Requirements...
  • Page 32: Lateral Positioner Stationary Rails Packaging

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.1.2.4 Lateral Positioner Stationary Rails Packaging Illustration 1-6: 3 Delivery Requirements...
  • Page 33: Innova C1 Frontal, C1 Lateral, And C2 Cabinets (Frontal And Lateral)

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.1.2.5 Innova C1 Frontal, C1 Lateral, and C2 Cabinets (Frontal and Lateral) Illustration 1-7: C1 and C2 Cabinets in crate The shipping weight is of about 90 kg (198.5 lbs) per cabinet. NOTE: Please use appropriate transportation and lifting means when handling the system cabinets.
  • Page 34: Omega Shipment

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.1.2.6 Omega Shipment Illustration 1-8: 3 Delivery Requirements...
  • Page 35: Power Distribution Box (Pdb) Ce

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.1.2.7 Power Distribution Box (PDB) CE Illustration 1-9: 3.1.2.8 Power Distribution Box (PDB) UL Illustration 1-10: Chapter 1 General Requirements...
  • Page 36: Other Elements Package

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.1.2.9 Other Elements Package NOTE: All OEM parts are shipped inside there original boxes group as needed on pallets. Illustration 1-11: 3 Delivery Requirements...
  • Page 37: Large Display Option

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.1.2.10 Large Display Option Illustration 1-12: Large Display Monitor on pallet Illustration 1-13: Large Display cabinet on pallet Chapter 1 General Requirements...
  • Page 38: Tools And Test Equipment

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.2 Tools and Test Equipment Refer to Table 1-2. To obtain a list of tools and test equipment for components not specified in Table 1-2, refer to the appropriate component Pre-Installation Manual listed in Chapter 2, System Compatibility.
  • Page 39 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 PRODUCT OR COM‐ TOOL OR TEST EQUIP‐ USED FOR SOURCE RECEIVED (DATE) PONENT MENT Ethernet adaptation kit General use (to be or‐ for laptop 2128794 dered before delivery of system) DL User parts Monitor Suspension...
  • Page 40: Door Size Requirements

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.3 Door Size Requirements Minimum door sizes also apply to hallways and elevators. For additional details, refer to Shipping Information 3.3.1 Door Height The minimum door height (to accommodate Innova positioner on its dolly) is 2001 mm (78.8 in). 3.3.2 Door Width The minimum door width needed (to accommodate the Innova Frontal/Lateral shipping dolly) is 1040 mm (41 in) with the cable inlet and the dolly stabilizers removed.
  • Page 41: Route Survey

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.4 Route Survey 3.4.1 Step One — Sketch Start preparing Route Survey by sketching a floor plan of the hospital or clinic which will receive the equipment. Include all areas on the delivery route from outside the building to destination. Illustration 1-14.
  • Page 42 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Table 1-3: Route Survey Ref. no. Area: loading dock, doorway, hallway, turn, elevator, Limitations: loading capacity, height, width, depth floor‐ obstruction, etc. ing material, radius, etc. 3 Delivery Requirements...
  • Page 43: Product Storage And Handling Requirements

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 4 Product Storage and Handling Requirements 4.1 Product Storage and Handling limits Relative Humidity and Temperature: Refer to Table 1-4. To obtain relative humidity and temperature requirements for components not specified in Table 1-4, refer to the appropriate component Pre–Installation Manual listed in...
  • Page 44 Storage 10 to 40 ºC (50 to 104 °F); 10 to 90 % RH, 250 day storage transportation –20 to +60 ºC (–4 to 140 °F) and 10 to 80% RH. The Detector chiller is shipped within GE Healthcare packaging. NOTE:...
  • Page 45: Fluoro & 3Kva Ups Shipment Duration

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 SUB-SYSTEM COMPONENTS ATMOSPHERIC PRESSURE (hPa) UL Fluoro UPS cabinet (*) 1013 CE Fluoro UPS cabinet (*) 1013 LDM cabinet LD core 1060 Detector conditioner 1060 Tube chiller Coolix 4100 1060 VCIM 1013...
  • Page 46: Transport Crate Labeling

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 4.3.1 Transport crate labeling Packaging environmental condition for PDB CE : The following markings shall be affixed on the packaging as per 5195050PSP. Illustration 1-15: Temperature, Humidity and Pressure label Refer the standard ISO 7000 for symbol.
  • Page 47 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 • C1 Frontal Cabinet, C1 Lateral Cabinet and C2 Cabinet: Illustration 1-16: • Frontal Gantry, Lateral Gantry and Omega Table: Illustration 1-17: Chapter 1 General Requirements...
  • Page 48 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 This page left intentionally blank. 4 Product Storage and Handling Requirements...
  • Page 49: Chapter 2 Equipment Requirements

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Chapter 2 Equipment Requirements 1 System Components 1.1 Presentation of the 3 Rooms 1.1.1 Examination room • Frontal Positioner • Lateral Positioner • Omega Patient Table • Performix X–Ray Tube Assembly (x 2) •...
  • Page 50: Control Room

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 1.1.3 Control room • VCIM • DL Flat Panel • DL Keyboard • Monitors 1 System Components...
  • Page 51: Description Of The System

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 1.2 Description of the System 1.2.1 Innova frontal and lateral positioner The Innova frontal and lateral positioner system includes: C2 cabinet, two positioners, and TSUI. Illustration 2-1: Frontal and Lateral System Product Layout Innova frontal and lateral positioner including: •...
  • Page 52 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 ○ X-Ray Tube cover spacer (Item 7) NOTE: Depending on country regulation (i.e. USA and New Zealand), the tube cover Spacer must be installed over the X-ray tube cover. ○...
  • Page 53: User Interface

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 1.2.2 User Interface Illustration 2-2: User interface devices Chapter 2 Equipment Requirements...
  • Page 54: Innova Patient Table

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 1.2.3 Innova Patient table Innova Systems can be supplied with an Omega table, which includes a table side control with Contour Filter. Illustration 2-3: 1.2.4 X–Ray generator The Innova System uses two Innova High Voltage Generator System with component parts as follows according to the power requested (100 kW): •...
  • Page 55: Innova Imaging System

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-4: Coolix 4100 chillers (Frontal and Lateral) with autotransformer 1.2.6 Innova Imaging System An Innova Frontal and Lateral System is managed and controlled by a System including: •...
  • Page 56 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-5: Technical cabinets 1 System Components...
  • Page 57: Monitor Suspensions

    Direction 5694389-1-1EN, Revision 2 Illustration 2-6: Thermo-con chillers (Frontal and Lateral) 1.2.7 Monitor suspensions GE provides as option several types of suspensions; alternatively, the customer can install the suspension of his choice (“open suspension”), provided all requirements in the paragraph Section 1.2.7.2 are met.
  • Page 58: Dl And Associated Devices

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 For further details on Open monitor suspension Pre-installation, please refer to Regulatory Requirements and Pre-Installation Instructions contained in Open Monitor Suspensions – Service Instruction for Installation contained in the Service manual. CAUTION Avoiding collision between gantry and third party equipment is under customer responsibilities.
  • Page 59: Aw Workstation Option

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-7: Innova User Area devices 1.2.9 AW workstation option AW workstation option is composed of a workstation, 1 or 2 monitors 19’’ flat panel in the Control Room and 1 monitor (flat panel) fixed on suspension (option) and 1 video switcher. Chapter 2 Equipment Requirements...
  • Page 60: Centricity Ca1000 Option

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 IST0315 - Advantage Workstation Volume Check Innova Installation Service Manual (JobCard Share 5 Installation (AW and video splitter) for switcher installation. 1.2.10 CENTRICITY CA1000 option Centricity Cardiology CA 1000 V2.0 Preinstallation Guide DOC0241470 in the OEMs Refer to : of the Innova IGS 620, Innova...
  • Page 61: 3Kva Cabinets Ups

    The Innova frontal and lateral system contains an InnovaCentral Touch Screen. 1.2.15 ECG Acquisition kit Option The ECG Acquisition kit allows for the connection of an ECG device (such as GE ECG devices MacLab, CardioLab or ComboLab) to the Innova system (C2 cabinet). The ECG Acquisition kit hardware consists of a Hubican and Physio modules and their associated cables.
  • Page 62: Large Display Subsystem Option

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-10: ECG Acquisition kit layout 1.2.16 Large Display Subsystem option The Innova system can integrate a Large Display solution to: • See images larger at full IQ with greater flexibility in monitor distance in the procedure room •...
  • Page 63: Dimension Drawings

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 1.3 Dimension Drawings Refer to this section for the dimensional drawings of the components of the systems with 21 & 31 cm detector. This section also contains the Frontal Gantry, Lateral Gantry and patient table sweep volume curves.
  • Page 64 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Title Illustration DL Image Monitor Dimensions Illustration 2-37 VCIM Illustration 2-38 1 System Components...
  • Page 65 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-11: Frontal Positioner Dimensions - Side View Illustration 2-12: Frontal Positioner Dimensions - Top View Chapter 2 Equipment Requirements...
  • Page 66 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-13: Frontal Positioner Dimensions - Front View 1 System Components...
  • Page 67 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-14: Lateral Positioner Dimensions - Side View Chapter 2 Equipment Requirements...
  • Page 68 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-15: Lateral Positioner Dimensions - Top View 1 System Components...
  • Page 69 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-16: Lateral Positioner Dimensions - Front View Chapter 2 Equipment Requirements...
  • Page 70 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-17: Omega IV Table Dimensions 1 System Components...
  • Page 71 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 NOTE: The 500 mm (19.7 in) minimum clearance between the table foot end and nearest object must take Into account any table devices installed on the table end rail. If there are any devices installed on the table foot end, the width of these devices must be added to the existing 500 mm (19.7 in) to maintain absolute minimum distance of 500 mm (19.7 in).
  • Page 72 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-18: Omega V Table Dimensions 1 System Components...
  • Page 73 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 NOTE: The 500 mm (19.7 in) minimum clearance between the table foot end and nearest object must take Into account any table devices installed on the table end rail. If there are any devices installed on the table foot end, the width of these devices must be added to the existing 500 mm (19.7 in) to maintain absolute minimum distance of 500 mm (19.7 in).
  • Page 74 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-19: Omega Table side clearence (CPR access) 1 System Components...
  • Page 75 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-20: Table Head Extender Chapter 2 Equipment Requirements...
  • Page 76 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-21: Gas box outlets Omega table 1 System Components...
  • Page 77: Frontal And Lateral Positioner And Omega Patient Table Relative Positions: - Side View

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-22: Frontal and Lateral Positioner And Omega Patient Table Relative Positions - Side View NOTE: (1) For Frontal Gantry isocenter to Table distance, refer to Table 2-2. (2) in the case of Lateral Gantry Off iso feature installed, the Lateral Gantry will work in the range - 200 mm (7.9 in) and 200 mm (7.9 in) from isocenter.
  • Page 78: Frontal And Lateral Positioner And Omega Patient Table Relative Positions: - Top View

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-23: Frontal and Lateral Positioner and Omega Patient Table Relative Positions - Top View Table 2-2: Patient Table - Frontal Gantry isocenter distances ANGIO / CARDIO CARDIO / NEURO Omega IV 1395 mm (54.9 in) Omega V - non motorized...
  • Page 79: Lateral Positioner Cable Drape Length

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-24: Lateral Positioner Cable Drape Length Maximum cable drape length is 6 m / 236 in (with vinyl zipper cable cover of 6.2 m / 244 in) from Lateral Gantry to ceiling exit point.
  • Page 80: C2 Cabinet (Frontal And Lateral) Dimensions

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-25: C2 Cabinet (Frontal and Lateral) Dimensions 1 System Components...
  • Page 81: C1 Frontal Cabinet Dimensions

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-26: C1 Frontal Cabinet Dimensions Chapter 2 Equipment Requirements...
  • Page 82: C1 Lateral Cabinet Dimensions

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-27: C1 Lateral Cabinet Dimensions 1 System Components...
  • Page 83 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-28: Dimension Diagram for X-Ray Tube Chiller 4100 NOTE: Required floor space depends on ambient room temperatures. When in doubt, allow for maximum floor space. Chapter 2 Equipment Requirements...
  • Page 84: Thermo-Con Detector Conditioner (And Mounting Brackets) Dimensions

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-29: Thermo-Con Detector Conditioner (and Mounting brackets) Dimensions 1 System Components...
  • Page 85 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-30: 3 kVA Cabinets and LDM UPS - model 9130 Chapter 2 Equipment Requirements...
  • Page 86 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-31: Fluoro UPS Cabinets (Optional) - UPS UL The left, right or back side of the UPS cabinet can be positioned against the wall. The front side of the UPS cabinet must be accessible for maintenance operation. In front of the cabinet, the clear width of the service area to insure electrical safety shall be at least 0.9 m.
  • Page 87 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-32: Fluoro UPS Cabinets (Optional) - UPS CE The UPS cabinet can be positioned against the wall but, in order to improve the ventilation and to make easier the maintenance operations for UPS and battery, we recommend a minimum distance of 200 mm (8”) from the wall.
  • Page 88: Ecg Acquisition Device Modules

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-33: ECG Acquisition Device Modules 1 System Components...
  • Page 89: Large Display Cabinet Dimensions (Optional)

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-34: Large Display cabinet dimensions (Optional) Chapter 2 Equipment Requirements...
  • Page 90: Large Display Suspension Dimensions (Optional)

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-35: Large Display suspension dimensions (Optional) 1 System Components...
  • Page 91: Dl Keypad Dimensions

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-36: DL Keypad Dimensions Chapter 2 Equipment Requirements...
  • Page 92 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-37: DL Image Monitor Dimensions 1 System Components...
  • Page 93 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-38: VCIM Chapter 2 Equipment Requirements...
  • Page 94: Monitor And Monitor Suspension References

    5520086 2393190-1–1EN • • CABLE HARNESS 24 m 5420085 • • or CABLE HARNESS 36 m or 5420087 OPEN MONITOR SUSPENSION Non-GE supplied See manufacturer’s docu‐ • CABLE HARNESS 24M • 5420085 mentation 5499175-1-1EN • or CABLE HARNESS 36M •...
  • Page 95: System Compatibility

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 1.5 System Compatibility 1.5.1 System Compatibility Cross–Reference – Innova Frontal and Lateral Positioner/Table Sub-System Product Name Pre-Installation Document Number Notes Frontal Gantry Combo Positioner (System This document with 31 cm detector) Frontal Gantry Cardio Positioner (System This document with 21 cm detector)
  • Page 96: And X-Ray Control Sub-System

    LCD 19” EIZO GmbH SMD 19100G Color sm 5219983-100 Monitor LCD 19” EIZO GmbH SMD 19100G B&W sm 5219983-100 Monitor Eizo 19” LCD HB color monitor RX150 GE sm 5499528-1-8EN 1.5.8 System Compatibilities Cross–Reference – Innova ECG Aquisition Option PRODUCT NAME MODEL NUMBER PRE-INSTALLATION DOCU‐...
  • Page 97: Room Layouts

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 2 Room Layouts 2.1 Room Dimension Requirements For Room size dimensions, refer to Room Layout Drawings. For additional details, refer to Room Layout Considerations. Chapter 2 Equipment Requirements...
  • Page 98: Room Layout Drawings

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 2.2 Room Layout Drawings 2.2.1 Patient Room Layout WARNING LOCATION IN TECHNICAL ROOM FOR ELECTRICAL CABINETS IS MANDATORY. THE ELECTRONIC CABINETS (C1, C2, OPTIONAL LD CABINET, COOLIX 4100 CHILLER, DETECTOR CHILLER AND FLUORO UPS WHEN INSTALLED ) INCLUDE FANS THAT ARE CREATING AIR–...
  • Page 99 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-39: Patient Room Layout for Innova System Chapter 2 Equipment Requirements...
  • Page 100: Technical Room Layout

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 2.2.2 Technical Room Layout For the service access and ventilation restraint dimensions below, see Dimension Drawings Room Layout Considerations. Illustration 2-40: 2 Room Layouts...
  • Page 101: Ecg Device Room Configurations

    Innova system: 2.2.3.1 Installation Configuration #1: For ECG devices installed in Control Room (such as GE ECG like MacLab, CardioLab or ComboLab) Both the Physio & Hubican modules are installed in the Control Room as shown below: Illustration 2-41: 2.2.3.2 Installation Configuration #2:...
  • Page 102: Illustration

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-42: 2 Room Layouts...
  • Page 103: Room Layout Considerations

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 2.3 Room Layout Considerations 2.3.1 Service Access Allow appropriate space for service access of equipment. Consult component pre–installation directions for clearance information. 2.3.2 Clinical Access Make sure that you plan the room with the following clinical access requirements: •...
  • Page 104 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 • Injectors. • Heart monitoring equipment. • Crash cart. 2.3.4 Emergency Stop It is recommended to install, in an accessible location, an additional EPO button that allows the instantaneous switching off of all power from the System (EXCEPT THE INPUT CABLE OF THE 3kVA UPS FOR CE CONFIGURATION WITHOUT FLUORO UPS), including UPS and Fluoro UPS outputs.
  • Page 105: Illustration

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-43: NOTE: The order of the cabinets above is C1 frontal, C1 lateral and C2 cabinets. This is just an example, cabinets can follow different orders. CAUTION The service area dimensions shown above are minimum requirements.
  • Page 106 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Location Constraint Name Parameter Specification Comment Technical to Exam Distance between Frontal Relative distance 19.5 m (64 ft) Tech and Exam room on same room Gantry foot and C1 or C2 floor.
  • Page 107 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Location Constraint Name Parameter Specification Comment Technical to Exam Distance between Lateral Relative distance 22 m (72 ft, 2 in) Tech on floor above Exam room room Gantry wall-box and De‐ tector Conditioner Exam room minimum rail length past...
  • Page 108: Illustration

    GE Healthcare’s Customer is responsible for the structural analysis and mounting of the base plates. If GE Healthcare is forced to mount the base plate, the Local Customer Team must hire a structural engineer to design and approve the mounting method and provide GE Healthcare with an engineering report.
  • Page 109: Illustration

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-45: Through–Bolt Supplied (Slab Type Floor Construction) 3.1.2 Floor requirements when using provided floor anchors The maximum pullout force per provided anchor was calculated assuming: • A concrete compression strength of 17.24 MPa at 28 days (which is the minimum required compression strength).
  • Page 110: Illustration

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-47: Table baseplate NOTE: Prepare the floor such that the Table baseplate will be flush with the floor surface. For alternative table bolts or seismic area, refer to template drawing shown in Gantry and table mounting holes contained in Illustration Mounting...
  • Page 111 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-48: Hole location in concrete floor Chapter 2 Equipment Requirements...
  • Page 112: Illustration

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Table 2-7: D distance of Illustration 2-48 ANGIO / CARDIO CARDIO / NEURO Omega IV Compact 1395 mm (54.9 in) Omega V Long 1278 mm (50.3 in) 1395 mm (54.9 in) Omega V non motorized Long 1278 mm (50.3 in) 1395 mm (54.9 in)
  • Page 113: Illustration

    Illustration 2-50: Water Conduit location with “On Grade” anchor kits Innova Frontal Positioner NOTE: For further information on kit 2286398 (S18101SK), refer to and Omega/Tilt Table Floor Preparation Kits (GE Healthcare supplied) in Mounting Requirements. Illustration 2-51: Cable Curvature with “Above Grade” anchor kits...
  • Page 114: Illustration

    Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-52: Cable Curvature with “On Grade” anchor kits NOTE: In case of on grade cabling, because of the minimum curvature constraint of 150 mm (6”), the cable will have to come from the side between Innova Frontal/Lateral Positioner and patient table.
  • Page 115 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.2 Mounting Requirements 3.2.1 Floor Loading and Recommended Mounting Methods Table 2-8. To obtain floor loading and recommended mounting methods for components not specified in Table 2-8, refer to the appropriate component Pre-Installation Manual listed in System Compatibility.
  • Page 116 3.2.2 Positioner and Table Floor Mounting The distances between the Innova Frontal Positioner and the Tables are critical for a proper clinical usage. For this reason, GE Healthcare provides two floor mounting templates to ensure these components are properly placed in relation to one another.
  • Page 117 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Table 2-9: Title Illustration Illustration 2-53 Illus‐ Innova Frontal Positioner Floor Mounting Methods tration 2-54 Cable Conduit For On-Grade Floor Anchor Kit Illustration 2-56 Inner Base Plate For Above Grade Floor Anchor Kit Illustration 2-55 Fixing Bolt Overview Illustration 2-57...
  • Page 118 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-53: Innova Frontal Positioner Floor Mounting Methods (1/2) 3 Room Structural Requirements...
  • Page 119 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-54: Innova Frontal Positioner Floor Mounting Methods (2/2) Chapter 2 Equipment Requirements...
  • Page 120 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-55: Inner Base Plate For Above Grade Floor Anchor Kit 3 Room Structural Requirements...
  • Page 121 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-56: Cable Conduit For On-Grade Floor Anchor Kit Chapter 2 Equipment Requirements...
  • Page 122 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-57: Fixing Bolt Overview NOTE: For more details on Table Baseplate, refer to Illustration 2-58. NOTE: With any kind of fixation methods (Bolts M20, Mechanical anchors or Chemical anchors), the number of holes used mandatory is: •...
  • Page 123 Pull out efforts and recommendations about chemical anchors not provided by GE. The following table provides the recommended chemical anchors for Table/Frontal baseplates and for the floor plate ordered locally that they could be used instead of bolts provided by GE. Table 2-10: Chemical anchors Pull out efforts and recommendations...
  • Page 124 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-58: Gantry and table mounting holes 3 Room Structural Requirements...
  • Page 125 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Table 2-11: D distance of Illustration 2-58 ANGIO / CARDIO CARDIO / NEURO Omega IV Compact 1395 mm (54.9 in) Omega V Long 1278 mm (50.3 in) 1395 mm (54.9 in) Omega V non motorized Long 1278 mm (50.3 in) 1395 mm (54.9 in)
  • Page 126 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.2.3 Innova Frontal Positioner and Table Floor Preparation Kits (GE Healthcare supplied) Illustration 2-59: 3 Room Structural Requirements...
  • Page 127 Illustration 2-60: Anchor kit choice NOTE: 2285053 is kit for through bolts with water/electric separator. All GE supplied vascular system floor preparation are contained in catalog. There are some additional gantry/table mounting kits based on each mounting method: through bolts or floor anchors.
  • Page 128 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.2.3.1 2285048 - Base Plate Assembly Table 2-12: Item Name Part # Description Quan. Notes Baseplate 2285059 12 Hole Floor Baseplate 1 pc Lift Plate 2290939 Lifting Straps 2 pc Hex Head 5166535...
  • Page 129 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.2.3.2 2360538 – Table Add–On Kit Table 2-13: Item Name Part # Description Quan. Notes Table Plate 2361993 Plate to be anchored under the ta‐ 1 pc Hex Screws 5120708 Screw M16x40x40 Inox A4-70 10 pc...
  • Page 130 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.2.3.3 2285050 – Assembly and separation select kit 3.2.3.3.1 2286398 – On grade, Floor anchor (S18101SK) Table 2-14: Item Name Part # Description Quan. Notes Floor An‐ 46-302265P1 Floor Anchor Bolt;...
  • Page 131 Screw M16x40x40 Inox A4-80 10 pc 4 only are used for Omega Pass NOTE: The kit 2285632 Floor plate / Baseplate assembly is needed when the floor plate is installed. This part isn’t GE part. It’s ordered locally. Chapter 2 Equipment Requirements...
  • Page 132 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.2.3.4 2285056 - A/C/N Templates Table 2-17: Item Name Part # Description Quan. Notes A/C/N Tem‐ 2185979 Frontal Positioner and Omega C/N 1 pc plates Patient Table floor mounting tem‐ plate 2127792 LCV+ Gantry and Omega A Pa‐...
  • Page 133 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-61: Baseplate plan 2359194 - Angio and Cardio configurations Chapter 2 Equipment Requirements...
  • Page 134 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.2.4 Injector Mounting Requirements CAUTION Table accessory rail load consideration: The maximum load per table accessory rail is 40 kg at 150 mm (60 N.m). Therefore: • Only light extra load not exceeding 5 kg at 100 mm (i.e IV pole with its accessories, pressure head...) is authorized on the same table accessory rail as the injector.
  • Page 135 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.2.5.3 Specific Prerequisites for Installation Configuration #2 Verify the following items only in the case of Installation Configuration #2 with ECG Device in Exam Room: 1. Check the environment of the ECG Device module located in Exam Room provides enough space to install the physio module at a max distance of 1 meter.
  • Page 136 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.3 Ceiling Requirements 3.3.1 Gantry rails The required ceiling rail height for the Gantry is 2845 mm +/–5 mm (9 ft. 4 in +/–0.2 in). The rails must be mounted so that the distance from isocenter to the wall where the park position is designated is an absolute minimum of 3081 mm (10 ft.
  • Page 137 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-62: Location of Stationary Rails on Ceiling – Delivered & Recommended max. configuration NOTE: It is recommended to install the Gantry Stationary Rails at the maximum configuration (Illustration 2-62).
  • Page 138 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-63: Location of Stationary Rails on Ceiling – Absolute min. configuration 3 Room Structural Requirements...
  • Page 139 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-64: Gantry Rail Mounting Specifications Chapter 2 Equipment Requirements...
  • Page 140 3.3.2.4 Rails selection Monitor suspension rails in different lengths can be selected. Please refer to the GTC or contact the GE representative. 3.3.3 Open Monitor suspension (option) Attention must be paid to the height of suspended elements of the open suspension, collision must be avoided with the gantry.
  • Page 141 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-65: Potential collision between Lateral gantry/carriage and detector lift Chapter 2 Equipment Requirements...
  • Page 142 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3.4 Wall Requirements The C1 Cabinets, the C2 Cabinet, the PDB Cabinet and LD cabinet (optional) must be securely fastened to the wall to prevent them from tipping. The optional LD secondary monitor outside the patient room is mounted on wall.
  • Page 143 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 2-68: Swing out arm Center of Gravity Chapter 2 Equipment Requirements...
  • Page 144 Seismic attachment hardware shown on seismic calculations may differ from hardware supplied with system. Any additional hardware that is required will be the responsibility of the institution and/or their contractor. Contact your local GE Installation Program Manager to obtain seismic calculations.
  • Page 145 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Chapter 3 Special Construction Requirements 1 Radiation Protection Because x–ray equipment produces radiation, special precautions may be needed or special site modifications may be required. The General Electric Company does not make recommendations regarding radiation protection.
  • Page 146 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 2 EMI Consideration IEC60601-1-2 Electromagnetic Standard Compliance & Documentation The information contained in this section is also found in the Innova system Operator Manual. 2.1 General Scope This equipment complies with IEC-60601-1-2: Edition 2.1 and Edition 3 EMC standard for medical devices.
  • Page 147 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Table 3-2: Immunity Test IEC 60601–1–2 Test Compliance Level Electromagnetic Environment Level Electrostatic dis‐ +/-6 kV contact +/-6 kV contact Floors are wood, concrete, or ceramic tile, or floors are covered charge (ESD) +/-8 kV air +/-8 kV air...
  • Page 148 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 The Innova system is intended for use in the electromagnetic environment specified below. The purchaser or user of the Innova system should assure that it is used in such an environment. Table 3-3: Immunity Test IEC 60601-1-2 Test Lev‐...
  • Page 149 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 ISM Frequency (MHz) Field Level Modulation 433.920 (ISM) 915 (ISM) 1440 3 V/m 80 % AM at 1 kHz rate 1750 1920 2450 (ISM) NOTE: : Industrial, Scientific and Medical (ISM) radio bands. Equipment used for tests: •...
  • Page 150 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 disturbances. However, when installed and operated as specified herein, the system will maintain its essential performance by continuing to acquire, display, and store diagnostic quality images safely. For example, a 1 W mobile phone (800 MHz to 2.5 GHz carrier frequency) shall be put 2.3 meters (see (*) Table 3-4) apart from the Innova system (in order to avoid images interferences...
  • Page 151 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 2.6 Installations Requirements & Environment Control NOTICE In order to minimize interference risks, the following requirements shall apply: • Cables shielding & grounding: All interconnect cables to peripheral devices must be shielded and properly grounded.
  • Page 152 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 ○ In order to reduce electrostatic discharge interference, install a charge dissipative floor material to avoid electrostatic charge buildup. ○ The relative humidity shall be at least 30 percent. ○...
  • Page 153 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Chapter 4 Environmental Requirements 1 Relative Humidity and Temperature NOTICE Avoid extremes in temperatures Innova system room climate requirements – relative humidity and temperature. Individual products or components are classed by their installation area for in use see Table 4-1, Individual products or components are classed separately for Storage, see...
  • Page 154 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 NOTE: (2a): In use temperature limits specify the range where the system shall work. Operating outside these limits could occur severe performance and reliability issues. (2b): Recommended temperature limits specify the range where it is recommended to adjust air conditioning control in order to warranty current operations inside the in use range.
  • Page 155 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 NOTICE In some cases condensation occurs and water drops from outlets and pipes of the air conditioner in the technical room. Therefore, it is critical to install the cabinets where there is no risk of flood from the air conditioner.
  • Page 156 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 2 Altitude and Atmospheric Pressure Refer to Table 4-2. To obtain altitude and atmospheric pressure requirements for components not specified in Table 4-2, refer to the appropriate component Pre–Installation Manual listed in Chapter 2, System Compatibility.
  • Page 157 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3 Heat Output 3.1 Equipment Heat Output Tables Refer to Table 4-3. To obtain heat output information for components not specified in Table 4-3, refer to the appropriate component Pre–Installation Manual listed in Chapter 2, System Compatibility.
  • Page 158 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 HEAT OUTPUT Maximum Use (maxi‐ Moderate Use (8 cas‐ Typical Use (13 cas‐ Stand by mum peak power dur‐ es / a 10 hour day) es / a 10 hour day) ing exam) Room Core System...
  • Page 159 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 The heat produced by the UPS is transferred to the environment by its ventilation. Cooling air enters the cabinets through the air inlet (grids) located at the bottom and exhausted through the outlet on the roof.
  • Page 160 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 The Large Display Monitor has been designed for use in the clean environment of medical diagnostics. The Large Display Monitor dissipates heat through the openings at the rear. Dust from dirty environments can penetrate into the display through these openings.
  • Page 161 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 4 Acoustic Specifications Audible noise: • Less than 50 dB (A) at 1 meter for an Innova Frontal Positioner. • Less than 50 dB (A) at 1 meter for an Innova Lateral Positioner. •...
  • Page 162 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 This page left intentionally blank. 4 Acoustic Specifications...
  • Page 163 3 kVA Single phase 100-127 V / 200-240 V 50 Hz or 60 Hz 11 A / 5.5 A Single phase S5I GE 100-120 V / 230 V 50 Hz or 60 Hz 400 VA Single phase NOTE: PDB maximum rating is equal to 211 kVA.
  • Page 164 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 WARNING PRIOR TO EACH INSTALLATION, ENSURE THAT THE ECG POWER CABLE IS CONNECTED TO A LINE THAT IS PROTECTED AGAINST SHORT CIRCUIT HAZARDS, ACCORDING TO LOCAL REGULATIONS AND THAT THE ECG MONITOR IS POWERED ACCORDING TO IEC60601-1 REQUIREMENTS (LEAKAGE CURRENT AND GROUNDING).
  • Page 165 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 • 1st Chiller by phases L1 and L2 • 2nd Chiller by phases L1 and L3 Illustration 5-2: Power configuration for Coolix 4100 Chillers A non-continuity measurement must be made between phase L2 of the frontal autotransformer and phase L3 of the lateral autotransformer.
  • Page 166 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 ○ The customer shall provide the power supply cables between the transformer and the UPS of the LD cabinet (for LD system option). ○ The LDM optional system must be powered through a wall circuit breaker or equivalent device with LOTO capability.
  • Page 167 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 1.2 Power Distribution NOTE: All short AC power cable less than 3 meters, between peripherals and respective power strip, are not shown. All have a single phase line, a neutral line and a ground wire.
  • Page 168 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-4: Power distribution - UL Cable CE UPS configuration UL UPS configuration Max length Recommended (1) Type Max gauge Recommended (1) Type R rectifier 5 x 10 mm² 3ph+N+PE AWG3 AWG6...
  • Page 169 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 1.3 Emergency Failure During an examination, any operator can encounter two main cases of failures. 1.3.1 Main power supply cut In this case, refer to Physical Runs. 1.3.1.1 Partial UPS Fluoro (option) A Fluoro UPS (20 kVA) has been designed for systems with 21 &...
  • Page 170 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 NOTICE Installation safety instructions: • Contractor responsibility: ○ Electrical contractor is responsible for providing and connecting the cables and configuring the PDB in by-pass mode. ○ GEHC is responsible for powering on the system with the UPS in by-pass mode.
  • Page 171 Electrical Requirements. Contact your local GE Healthcare representative for more information and/or public power distribution analysis. 1.3.2 System failure In the event of a system failure with a patient on table during an examination, the operator can utilize a Surgical Imaging mobile unit to finish the examination.
  • Page 172 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 1.4 Power Distribution System NOTICE It is recommended to separate power supply cables from the other cables. 1.4.1 Power Distribution Box - CE Illustration 5-5: PDB CE - 50 Hz 1 Power Requirements...
  • Page 173 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-6: PDB Schematic CE - 1/2 Chapter 5 Electrical Requirements...
  • Page 174 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-7: PDB Schematic CE - 2/2 1 Power Requirements...
  • Page 175 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 1.4.2 Power Distribution Box - UL Illustration 5-8: PDB UL - 60 Hz (US only) Chapter 5 Electrical Requirements...
  • Page 176 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-9: PDB Schematic UL - 1/2 1 Power Requirements...
  • Page 177 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-10: PDB Schematic UL - 2/2 Chapter 5 Electrical Requirements...
  • Page 178 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 2 Grounding 2.1 Grounding A vascular lab is a critical care area and requires a special grounding system for patient safety. An equipotential grounding system is recommended for meeting patient safety requirements. Reference: For general system grounding requirements and information on establishing an equipotential grounding system, refer to: - Grounding Continuity –...
  • Page 179 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-11: Grounding distribution Table 5-3: CABLE FROM WIRE GAUGE 28189 C1 Frontal Cabinet LCD Monitor Suspension AWG6 28190 C1 Frontal Cabinet LCD Monitor Suspension AWG6 Chapter 5 Electrical Requirements...
  • Page 180 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 CABLE FROM WIRE GAUGE 2308096 C1 Frontal Cabinet Jedi AWG6 2308096 C1 Lateral Cabinet Jedi AWG6 10906B Injector Omega Table AWG10 10908B Injector Omega Table AWG10 11257A C2 Cabinet Injector AWG22 27030A...
  • Page 181 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 CABLE FROM WIRE GAUGE C1 Frontal Cabinet 35 mm² AWG1 hospital C1 Frontal Cabinet 35 mm² AWG2 hospital C1 Lateral Cabinet 35 mm² AWG1 hospital C2 Cabinet 6 mm² AWG8 hospital Fluoro UPS...
  • Page 182 0.101 0.108 0.114 0.12 NOTE: These 3 phases cables are not furnished by GE Healthcare. Provided by installer. • These cables must be kept separated as much as possible from room system cables. • The shield of any shielded cable coming from the distribution cannot replace the ground wire.
  • Page 183 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Table 5-5: System FEEDER from hospital Power supply voltage 480 V Panel (PDB) to C1 run in m (ft) 8 (26) 16 (52) 24 (79) Feeder run length: 10 m (30 20 m (70 ft) WARNING...
  • Page 184 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 3 Interconnections 3.1 MIS (Master Interconnect System) Innova system interconnect cables are described in MIS (Master Interconnect System) documents. These documents specify all interconnections between components within the system.
  • Page 185 & PC are installed. • If no GE Maclab cable 2016134-106 installed between the TRAM (Exam Room) and the Control Room, need to route it so that installation/connection of Physio module can be made in Control Room.
  • Page 186 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 NOTE: MEDRAD Avanta Table mount: A 76.2 mm (3 in) and max 25 m (984 in) length conduit between technical room and patient room shall be prepared below the floor for the three injector cables.
  • Page 187 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-13: Floor ducts and outlets NOTE: 18 meters (59 ft) is the only cable length available for the Remote TSUI box data cable connecting remote TSUIs in the control booth and the patient table. Chapter 5 Electrical Requirements...
  • Page 188 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 4 System Cable Information 4.1 Physical Runs NOTICE All lengths of cable are: • in useable meter when you look at group level, or • in meters (connector to connector) when you look at the cable level. Suspension are always pre–cabled with 36 meter cables of connector to connector Monitor options includes their 24 meters length for cabling In case 24 m required, they have to be added in the order and replaced on site.
  • Page 189 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-15: CABLE GROUP 1 – FROM TECHNICAL AREA TO EXAM AREA Chapter 5 Electrical Requirements...
  • Page 190 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-16: CABLE GROUP 2– FROM TECHNICAL AREA TO CONTROL AREA 4 System Cable Information...
  • Page 191 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-17: Cable Group - Fast Link Option Chapter 5 Electrical Requirements...
  • Page 192 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-18: CABLE GROUP 3 - FROM TECHNICAL AREA TO TECHNICAL AREA 4 System Cable Information...
  • Page 193 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-19: CABLE GROUP 4 - FROM TECHNICAL AREA TO EXAM AREA Chapter 5 Electrical Requirements...
  • Page 194 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-20: CABLE GROUP 5 - FROM TECHNICAL AREA TO EXAM AREA 4 System Cable Information...
  • Page 195 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 5 X-Ray ON Lamp Distribution The fitter shall install an X-Ray On lamp in the Exam room, and in the control room if necessary, outside the patient area, so that they are connected to the equipment through connection terminals.
  • Page 196 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 6 Ready For X-Ray Lamp Innova systems with 21 & 31 cm detector provides contacts for driving a Ready for X-Ray lamp. These contacts are terminals 5 and 6 of TB2 bulkhead connector of the C2 cabinet. Illustration 5-22: X-Ray READY cabling between C2 cabinet and PDB NOTE: Check local regulations if this indication is required.
  • Page 197 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 7 Door Interlocks CAUTION IEC 60601–2–43 requires not to install door interlocks. It is the responsibility of the field service to check that this requirement is not in contradiction with local regulation.
  • Page 198 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 8 Room Speaker The remote speaker provides the operator in the exam room, the indication of record exposure sequence (same level information as provided by the control room control panel). The speaker must be installed in the exam room out of the patient vicinity to give easy access to the FE for maintenance operations and to medical staff to adjust the tone signal level and to be able to see the power LED indicator.
  • Page 199 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 9 MAC-LAB System EX Electrical Ducts For location of MAC–LAB Acquisition Unit Floor mount kit 408431–001, refer to Cable Channeling. For MAC–LAB System EX, refer to: - Marquette document P/N 2000465–001 Preinstallation Guide Chapter 5 Electrical Requirements...
  • Page 200 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 10 Advantage Windows A power cord is supplied with Advantage Windows. It is connected to outlet fed by the main disconnect room device. Verify that the ground between AW, AW spliter and monitors ground are equipotential (0.1 ohm equipotentiallity between room ground point (busbar) and wall outlets).
  • Page 201 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 11 Injectors The injector is provided with an additional ground cable (P/N #2135737) to meet equipotentiality requirement at patient vicinity. Injector emergency power off: • if no emergency power off is required for the injector, the injector can be powered from a wall outlet socket.
  • Page 202 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 12 Lighting Specifications 12.1 Room Light Distribution 12.1.1 Requirements for lighting Requirement for lighting concern the following, general, light–technique characteristics: • Illuminator level. • Lighting distribution. • Preventing the operator from being dazzled by the light (by direct light sources or by reflection on bright objects).
  • Page 203 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 Illustration 5-25: ROOM LIGHT cabling between C2 cabinet and PDB Chapter 5 Electrical Requirements...
  • Page 204 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 12.1.3 Room Lighting for System Illustration 5-26: Zone 1: Intensive lighting needed by operator. Manually cut not located at false ceiling level. Zone 2: Variable lighting without specular reflection on display and monitor screens. Indirect lighting but preferable from ceiling.
  • Page 205 A request form has been defined. For more information, please refer to IP Addressing Process or contact your GE Healthcare OLC representative. NOTICE The C1 frontal cabinet comes equipped with a Firewall unit. The hospital network must be capable of connecting to this firewall.
  • Page 206 Innova IGS 620, Innova IGS 630 Preinstallation Manual Direction 5694389-1-1EN, Revision 2 1.2 IP Addressing Process To obtain an IP address, contact the following for your pole: • GEMSAM: Contact: OnLine Center–Americas, Network Products and Services (NP&S) Telephone: 1–800–321–7937 NOTE: Press [1] for the Online Center.
  • Page 208 © 2016 General Electric Company. All Rights Reserved. General Electric Company 283, rue de la Minière 78530, Buc FRANCE www.gehealthcare.com...

This manual is also suitable for:

Innova gs 630

Table of Contents