GE Healthcare
Revision 1
Job Card D/R A207 - Lift Belt
1
SUPPLIES
Lift Belt
2
TOOLS
Standard Tool Box
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 60 minutes
4
SAFETY PRECAUTIONS
WARNING
The lift belt has a larger mechanical energy when the arm is at heights of less than the
maximum height. To minimize the risk of rapid lift belt movement due to stored mechani-
cal energy, you must ensure that the Arm is raised to its maximum height before you pro-
ceed.
WARNING
The Gantry must be powered off.
5
PREREQUISITES
•
Raise the arm to its maximum height.
•
Switch off the system power.
•
Remove the Front and Column covers for access to
the lift belt (1) (refer to
Reinstall Gantry Covers on page
•
Loosen and remove the Gantry curtain (refer to
Card D/R A208 - Gantry Curtains on page
JC-DR-A-207.fm
Service Information and Procedures Class A 2385072-16-8EN
Job Card PHY A044 - Remove/
523).
1193).
Page no. 1189
1
Job
Senographe DS
Job Card D/R A207 - Lift Belt
Chapter 9
Chapter 9