Honeywell Vertex Edge User Manual page 49

72-point continuous monitor
Hide thumbs Also See for Vertex Edge:
Table of Contents

Advertisement

Power On
Use the rack power switch behind the touch screen door to power up the Vertex Edge System.
1. Open the touch screen door.
2. Turn on the rack power switch.
3. Turn on the power switch to appropriate analyzers.
4. Close and latch touch screen door. After 15 seconds, the analyzer status LEDs sequence four
times through all colors.
1) Main Power ON/OFF Switch, 2) Analyzer Power Switches
After the initial color sequence, the Analyzer LEDs show system status. The following chart
matches analyzer status with LED signals.
NOTE
Before the Vertex Edge System can begin monitoring, you must create and install a
configuration profile.
Vertex Edge System
48
User Manual

Advertisement

Table of Contents
loading

Table of Contents