Install an Analyzer
WARNING: Do not connect or disconnect anything from the Power Distribution Unit (PDU)
while energized.
1. Turn analyzer power switch off at the PDU.
2. Reach into the slot and position cables out of the way.
3. Place analyzer on slides. Push in until locks engage.
4. Slide Analyzer out until fully extended.
5. Reach behind the analyzer; connect the tubing harness.
IMPORTANT: The 2 screws need to be tightened to fully secure. If these are not tightened,
the unit will leak.
6. Connect the Analyzer internal Ethernet cable (1) and power connector (3) from the Analyzer.
Vertex Edge System
107
User Manual