Cisco 8800 Series Hardware Installation Manual page 77

Hide thumbs Also See for 8800 Series:
Table of Contents

Advertisement

Powering on the Router
Figure 58: HVAC Power Connection
Step 3
For HVDC input, connect a Saf-D-Grid DC cable to a Saf-D-Grid receptacle, otherwise:
a) Connect the ground terminal ring on the power cable to the ground terminal on the DC power source and
secure it in place with a nut tightened to the appropriate torque setting for the terminal post.
b) Connect the negative terminal ring on the power cable to the negative (-) terminal on the DC power source
and secure it in place with a nut tightened to the appropriate torque setting for the terminal post.
c) Connect the positive terminal ring on the power cable to the negative (+) terminal on the DC power source
and secure it in place with a nut tightened to the appropriate torque setting for the terminal post.
Step 4
Verify that the Saf-D-Grid plug is plugged in completely to secure the built-in retaining latch.
Step 5
Turn on the circuit breaker for the HVAC or HVDC power source circuit.
Note
Step 6
Turn on the switch of the power shelf to turn on the system.
What to do next
Use the power-mgmt redundancy-num-pms number command in config mode to convert the power module
redundancy from n+1 to n+x, specifying the number of redundant power modules that the you want to configure.
The total number of functioning power modules in the system is at least x number more than the number of
power modules that are needed to support the power required for all the cards in the system. The range is
0–11; 0 means that no power redundancy is required.
RP/0/RP0/CPU0:ios# config
RP/0/RP0/CPU0:ios(config)# power-mgmt redundancy-num-pms 2
RP/0/RP0/CPU0:ios(config)# commit
Tue Sep 24 09:03:22.889 UTC
Commit complete.
Use the hw-module attention-led location0/PM number command in config mode to enable and use the no
form of the command to disable the ID LED on the specified power supply.
RP/0/RP0/CPU0:ios# config
RP/0/RP0/CPU0:ios(config)# hw-module attention-led location 0/PT0-PM0
RP/0/RP0/CPU0:ios(config)# commit
If you use both inputs, the IN LED of the power supply is green. If you use only one input, the IN
LED is blinking green.
Connect HVAC/HVDC Power Supply to Power Source
Hardware Installation Guide for Cisco 8800 Series Routers
71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8818881288088804

Table of Contents