Cisco 8800 Series Hardware Installation Manual page 47

Hide thumbs Also See for 8800 Series:
Table of Contents

Advertisement

Unpack and Install the Chassis
one at the bottom, likewise add more screws in this sequence. The number of screws may vary based on the
chassis.
Note
Step 3
Repeat Steps 1 and 2 to attach the other cable management bracket to the vertical mounting bracket on the
opposite side of the chassis.
Step 4
Remove the power shelf bezel from the chassis and proceed with bottom cover and top hood installation.
Step 5
Position the bottom cover, with its brackets pointing up, to the bottom of the two side cable management
bracket screw holes.
Figure 28: Bottom Cover for 8818 Chassis
Do not fully tighten the screws until the cable management brackets, bottom cover, and top hood
are installed.
Install Cable Management on a Chassis
Hardware Installation Guide for Cisco 8800 Series Routers
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

881888128808

Table of Contents