Unpack and Install the Chassis
one at the bottom, likewise add more screws in this sequence. The number of screws may vary based on the
chassis.
Note
Step 3
Repeat Steps 1 and 2 to attach the other cable management bracket to the vertical mounting bracket on the
opposite side of the chassis.
Step 4
Remove the power shelf bezel from the chassis and proceed with bottom cover and top hood installation.
Step 5
Position the bottom cover, with its brackets pointing up, to the bottom of the two side cable management
bracket screw holes.
Figure 28: Bottom Cover for 8818 Chassis
Do not fully tighten the screws until the cable management brackets, bottom cover, and top hood
are installed.
Install Cable Management on a Chassis
Hardware Installation Guide for Cisco 8800 Series Routers
41