Honeywell AlarmNet GSMBR Installation And Setup Manual page 12

Communications module
Table of Contents

Advertisement

GSMBR / iGSMBR Installation and Setup Guide
For EOLR supervised N.O. or N.C. voltage tripping, the resultant voltage change from a
tripped zone is detected.
NOTE: LYNXR and LYNXR-EN have a designated V– trigger output (LRR / AAV).
Connect a wire from the triggering source (bell output, voltage trigger, etc.) of the control
panel to the zone input of the module, and connect a common ground between the module
and control panel. See the zone connection examples in the figures below:
TRIGGERING DEVICE
Figure 2-4. Wiring Zone Z1/Z2 Input for a Positive (V+) Trigger
TRIGGERING DEVICE
Figure 2-5. Wiring Zone Z1/Z2 Input for a Ground (V–) Trigger
2-4
GND
+ TRIGGER
(VOLTAGE: 2-13V)
GND
-
TRIGGER
(VOLTAGE: 0-1V)
NOTE: TRIGGER VOLTAGE
IS +V TO GROUND FALLING
EDGE TRIGGER
TRANSFORMER
TB1
1
2
4
5
COMMUNICATIONS
MODULE
TRANSFORMER
TB1
1
2
4
5
COMMUNICATIONS
MODULE
AC INPUT 1
AC INPUT 2
GND
ZONE INPUT Z1/Z2
J1
AC INPUT 1
AC INPUT 2
GND
ZONE INPUT Z1/Z2
J1
BATTERY
BATTERY

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alarmnet igsmbr

Table of Contents