Softstarters Type PSE18...PSE370 Installation and commissioning manual 1SFC132057M0201
Chapter 4 Mounting
This chapter describes instructions on how to receive the softstarter and how to
mount it in a proper way.

4.1 Receiving, unpacking and checking

Check that the package is turned with the correct side up, figures 4.1 and
4.2.
Check for transport damages.
Remove the transport casing.
Visually inspect the softstarter.
Check that the order code corresponds with the delivery documents.
Check that all items are included, according to the delivery note.
Check the softstarter as well as the package. If you find any damages, please
contact the transport company or the supplier immediately.

4.1.1 Intermediate storage

Until the softstarter is mounted it should be stored in its package.

4.2 Mounting

4.2.1 Handling when mounting

The softstarter is available in three physical sizes. All models of PSE can be taken
out of the packages and be mounted without lifting equipment. See chapter 3.7.2
for weights.
Warning!
Never lift the softstarter by the connection bars, since it may cause damage
to the product.