R
epair
[3] DISASSEMBLY/ASSEMBLY
[3] -4. Motor Section (cont.)
ASSEMBLING
3) Assemble the Motor section to Housing (L) as illustrated in Fig. 45.
Fig. 45
rib
projection
notch in Yoke unit Brush holder complete
Assembling Yoke Unit to Housing (L)
With the projection on Housing (L) fitting in the notch on Yoke,
put Yoke unit inside the four ribs on Housing (L).
[3] -5. Switch
ASSEMBLING
Put the projection on Switch between the prongs of F/R change lever,
then assemble the Switch to Housing L. (Fig. 46)
Housing L
groove
Assembling Brush Holder to Housing (L)
1) Fit Brush holder complete in the groove
of Housing (L).
2) The flat portion of Brush holder complete
must be at 90 degrees to the edge surface
of Housing L.
flat portion of Brush holder complete
edge surface of
Housing L
Housing L
Brush holder complete,
viewed from the Case assembly installation side.
Fig. 46
F/R change lever
Switch
P 15/16
90 degrees
prong
projection