Bosch Integrus Installation And Operation Manual page 62

Language distribution system
Hide thumbs Also See for Integrus:
Table of Contents

Advertisement

62
en | Configuration
7.
8.
9.
CAUTION!
Turn the delay switches carefully to a new position until you feel that it clicks into position, to
prevent that a switch is positioned between two numbers, which would result in a wrong
delay setting.
NOTICE!
When a master-slave configuration is used for rooms which are always separated, the delay
switch positions can be determined per system and the delay caused by transmission from
master to slave transmitter can be ignored.
Figure 7.5, Table 7.1, Table 7.3 and Table 7.4 illustrate the calculation of the extra master-
slave signal delay.
Figure 7.5 System with master and slave transmitter in multi purpose room
Cable length
master-slave
transmitter
[m]
50
Table 7.3 Calculation of the master-to-slave signal delays
IOM-INT | V1.1 | 2010.12
Divide the signal delay difference by 33. The rounded off figure is the signal delay switch
position for that radiator.
Add delay switch positions to radiators under a balcony, if applicable (see section 7.4.3 )
Set the delay switches to the calculated delay switch positions.
20m
R1
R2
R3
R5
20m
R4
R6
R7
20m
R8
R10
R9
20m
Cable signal
delay per meter
[ns/m]
5.6
Installation and Operation manual
30m
20m
Tx1
30m
50m
30m
Tx2
20m
30m
Cable signal
Signal delay
delay [ns]
slave transmitter
[ns]
50x5.6=280
33
Integrus
Master-to-slave
signal delay [ns]
280+33=313
Bosch Security Systems B.V.

Advertisement

Table of Contents
loading

Table of Contents