GE NEMA User's Manual & Installation Instructions page 20

Evse charging station
Table of Contents

Advertisement

g
EV Charging Station
ensure meet UL and American Disability Act compliance. This will ensure the critical height shown in
Figure 21.
IMPORTANT: Exercise extreme caution when drilling holes in the wall. Make sure there are no electrical
cables.
Figure 19: Wall-Mount Bracket Holes
Fasten the wall bracket to the wall. Refer to Table 6 for recommended wall mounting fasteners.
Supply two ¾" conduits (one for power cable and other one for communication cable) as per bracket
drawing dimensions and connect supplied ¾" conduit hubs to conduits. If the communication cable
and the corresponding conduit is not used, cover the hole with supplied NEMA 3R knockout plugs.
Optionally, the power wire can be run through the bottom of the enclosure. See page 24.
GE EV Charging Station User Manual
User Manual & Installation Instructions
Figure 20: Wall-Mount Bracket
Min: 19"
Max: 25"
20 of 86

Advertisement

Table of Contents
loading

Table of Contents