EV Charging Station
Controller 1

2.6 Wall-Mounted

Bill of materials
ITEM
1
2
3
4
5
Procedure
Drill 6 holes in the wall as illustrated in Figure 19. Use the supplied wall-mounting bracket to ensure
correct alignment. The height of the bottom hole from the floor should be between 19" to 25" to
GE EV Charging Station User Manual
Figure 18: Ethernet Connection to Controller for Double Pedestal
DESCRIPTION
Kiosk Unit
Wall Bracket Assembly
Hex. Nuts ¼"-20
Sealing Washer, ¼" dia.
Conduit Hub, ¾"
WARNING: Make sure power to the EVSE is
disconnected before performing any task
User Manual & Installation Instructions
Controller 2
CHARACTERISTICS
Wall mounted
enclosure
(4) ¼"-20 Weld
Stud
Zinc Plated Steel
Seals ¼" studs
Attach to ¾"
conduits/enclosure
- Table 5 -
QTY
1
1
4
4
2