7.1.2 Commissioning the Logic Load Disconnection (Powering-
Off) of the Power Supply System Under Normal Temperature
Prerequisites
The FusionModule1000 is powered on, commissioned, and working properly.
Preparations
Tools: none
Documents: power supply and distribution system diagrams, power supply and
distribution device layout diagram
Skill requirement: power distribution engineer
Procedure
Step 1 Power off the FusionModule1000 by following instructions in
and Powering
● Save parameters before power-off.
● Power off the devices in the normal power-off logic sequence.
Step 2 Verify whether the system and devices are intact and working properly.
Step 3 Power on the FusionModule1000 by following instructions in
Commissioning.
Step 4 Verify whether the systems run stably after power-on.
----End

7.2 Cooling System Commissioning

Before putting the FusionModule1000 into use, you must commission the cooling
system to ensure normal cooling.
Issue 03 (2022-12-15)
NO TE
For the diagrams and tables, see the initial configuration parameter manual for the solution
in use.
Off.
NO TICE
If yes, go to
Step
3.
If no, locate and rectify the fault. Then go to
NO TE
The FusionModule1000 meets requirements if its devices are intact and systems are normal
after powered off, and systems run stably after power-on.
Copyright © Huawei Digital Power Technologies Co., Ltd.
7 System Commissioning
8 Shutting Down
Step
3.
6 Power-On
44

Advertisement

Table of Contents
loading

Table of Contents