Huawei FusionModule1000A20 Commissioning Manual page 44

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One
Data Center
Commissioning Guide
Syste
m
(Optio
nal)
Fire
exting
uishin
g
system
(CE)
Lightin
g
system
Issue 03 (2022-12-15)
Check
Operation Method
Item
Device
Check the fire extinguishing
installa
device installation and cable
tion
connections.
and
cable
connect
ions
Compo
Check the lighting device
nent
installation and connection.
installa
tion
and
connect
ion
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Checking Before Power-On
Standards Compliance
● The pressure pointer of
the fire extinguisher
cylinder is in the green
zone.
● The dowel of the fire
extinguisher cylinder is
properly installed and
intact.
● All cables are correctly
and securely connected.
● Devices are installed in
positions shown in the
lighting device layout
diagram.
● Cables are correctly
connected.
37