3-3-20. Threading Arm Assembly Replacement
Outline
Replacement
Tension regulator band assembly removal
Tension regulator assembly removal
Threading arm assembly removal
Threading arm assembly installation
Tension regulator assembly installation
Tension regulator band assembly installation
Tension regulator (S5) guide cleaning
Threading arm assembly (S4) guide cleaning
Adjustment after replacement
Tension regulator operation position check
FWD back-tension adjustment
Tape running adjustment
Preparations
1. Confirm that the unit is in the unthreading end state.
2. Turn off the power.
3. Remove the front lid and outside panel.
(Refer to section 1-6 in Part 1 of the Maintenance Manual.)
4. Remove the cassette compartment.
(Refer to section 3-3-24.)
n
Stop washer is used for installation of threading arm assembly. Do not reuse it.
Install the new one (3-559-408-11) when replacing the threading arm assembly.
Tools
. Stop washer insertion tool
. FWD back-tension measurement cassette
. Cleaning cloth
. Cleaning fluid
. Torque screwdriver bit (for M1.4)
. Torque screwdriver (for 3 kg)
DNV-5
DNW-7/90/90WS
J-6323-530-A
J-6323-890-A
3-184-527-01
9-919-573-01
J-6325-110-A
J-6325-400-A
3-3-20. Threading Arm Assembly Replacement
3-91