Huawei CX320 User Manual page 44

Switch module
Table of Contents

Advertisement

CX320 Switch Module
User Guide
2.
3.
Step 4 Install the CX320.
1.
Issue 09 (2019-08-02)
Figure 3-3 Removing the switch module filler panel
Raise the two handles on the switch module filler panel completely, and pull the filler
panel horizontally out of the chassis. See (2) and (3) in
Store the switch module filler panel for future use.
Raise the two ejector levers on the CX320 completely and push the CX320 horizontally
into the chassis as far as it will go. See (1) and step (2) in
Figure 3-4 Installing the CX320
Copyright © Huawei Technologies Co., Ltd.
3 Installing and Removing the CX320
Figure
3-3.
Figure
3-4.
38

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents