Electrical installation
4.5 Connections
4.5.10.2
Cable routing for Line Connection Modules
For the Line Connection Modules, the customer must carry out the following cabling or
connection work:
Table 4- 11
Cable routing
Cable for supply infeed
Signal cables
Notice:
The "Basic rules for cable routing" and "Preparatory steps" described above must
be observed whenever any cabling or connection work is performed.
76
Checklist for cabling or connection work for Line Connection Modules
Completed?
S120 Cabinet Modules Equipment Manual
Manual, (GH5), 10/2008, A5E00427098A