4.2.11

Performing a Visual Inspection

Introduction
Before starting up the system, you must perform a visual inspection of the hardware, cables,
and the power supply. The procedure is shown in Table 4-9. The visual inspection must be per-
formed while the system is disconnected from the power supply.
Caution
7
Before beginning work, make sure that the system is grounded and disconnected
from the power supply.
Observe the measures for protecting electrostatically sensitive devices (see Page 1-
9).
Visual Inspection Procedure
Table 4-9
Visual Inspection Procedure
Step
1.
Compare the slots of the
available boards with the
component mounting dia-
gram.
2.
Check that all boards are
secure.
3.
Check that a shielding cover
has been attached for all
boards with no connection
options in the front cover.
4.
Check whether the slots for
LUNA2 and for REALS (ba-
sic cabinet only) are cov-
ered by an outer panel.
5.
Check whether all system
cabinets have been sealed
at the rear with the connec-
tion and filler panels provid-
ed.
P31003-H3550-S403-4-7620, 02/05
HiPath 3000 V5.0, HiPath 5000 V5.0, Service Manual
Activity
Board assign-
ment map
See Page 4-34
Resources/
Remarks
If necessary, correct the board config-
uration and notify the sales depart-
ment.
If necessary, plug the boards in again.
If necessary, replace missing shield-
ing covers (refer to Page 4-35).
If necessary, attach the outer panel
(see Page 4-36).
Get additional connection and filler
panels where required.
inst_h3.fm
Installing HiPath 3000
Installing HiPath 3800
Action
4-81