Samsung BACnet Gateway MIM-B17N Installation Manual page 48

Hide thumbs Also See for BACnet Gateway MIM-B17N:
Table of Contents

Advertisement

7
Message will appear to alert that tracking is completed. Select the zone initializing
mode and click [OK].
 No initialization: No zone information initialization will be made.
 Individual initialization: Initialize zone information as individual mode.
 Group initialization: Initialize zone information as group mode.
8
Page will be refreshed by clicking [OK]. Then you can check the tracking result.
Note
 If tracking is executed successfully while 'NEW' is set as communication mode for each
channel, virtual OnOff controller will be assigned to each channel.
 If there is no searched outdoor unit, OnOff controller, SIM/PIM, it is regarded as DVM
tracking failure.
 If there are devices which have same address, first searched device will be registered
only.
❈ Searching order is not fixed.
 The number of OnOff controller does not contain the number of virtual centralized
controller.
 Total number of indoor units includes general indoor units, ERV and AHU .
If you execute tracking, system setting will be initialized.
If tracking result does not match with actual installation information, there can be
critical error in additional functions such as power distribution.
Make sure that tracking information matches to actual installation information
after tracking.
NASAS_MIM-B17N_BACnet Gateway_IM_EN_03719A(1).indd 47
47
E-
2013-04-25 오전 10:14:40

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bacnet mim-b17n

Table of Contents