Close the Enclosure Cover and End of Installation

After wiring connection, the user must place back the Touchkey/LCD assembly, just
reverse the steps discussed in
and align through the ABB LOGO and align two screws in the Touchkey/LCD assembly
to the two holes in ATB/enclosure as shown in the figure below.
Figure 3.8: Align Two Screws in the Touchkey/LCD assembly to the Two Holes in
ATB/Enclosure
8VZZ005286 B
Appendix
F.
Section
3.3.4. At first, pay attention to the upward direction,