3
Installation
This section consists of three main parts:
Site verification

Networking preparation

Product installation
The first two activities must be done just once for each flame detection system. The
second (networking preparation) is needed only when the user is about to use the digital
communication capabilities of the SF910i. The third must be repeated for each single
unit to be installed.
3.1
Site Verification
This activity consists in verifying that the local environment of the physical installation
location complies with the product specifications.
Not to be installed in direct sunlight.
3.2
Networking Preparation
For SF910i, there is one MODBUS based on RS-485 serial communication line that
connects all units together.
First, decide whether to make use of the digital communication capabilities of the SF910i
or not. In case, the user do not want this feature, just skip this activity and go to product
installation.