Toro 23208 Operator's Manual page 31

Stump grinder
Hide thumbs Also See for 23208:
Table of Contents

Advertisement

2. Stop the engine, remove the key, and wait for all moving
parts to stop before leaving the operating position.
3. Lift/support the side of the unit to be worked on so
that the track is 7.6 to 10 cm (3 to 4 inches) off of the
ground.
4. Back out the tensioning bolt and jam nut (Figure 45).
5. Loosen the clamp bolts (Figure 45).
6. Push the front road wheel rearward as far as it will go
(Figure 46).
Figure 46
7. Begin removing the track at the top of the front road
wheel, peeling it off of the wheel while rotating the
track forwards.
Note: You may need to remove the front, outside
road wheel. To remove this wheel, remove the snap
ring and cap from the center of the road wheel (Figure
47). Next remove the bolt and gasket from the center
of the wheel and pull the wheel off of the machine.
Figure 47
1. Snap ring
2. Cap
3. Bolt
8. When the track is off of the road wheel, remove it from
the machine (Figure 46).
9. Beginning at the drive sprocket, coil the new track
around the sprocket, ensuring that the lugs on the track
fit between the spacers on the sprocket (Figure 46).
4. Gasket
5. Wheel with bearings
10. Push the track under and between the rear and center
road wheels (Figure 46).
11. Starting at the bottom of the front road wheel, install
the track around the wheel by rotating the track
rearward while pushing the lugs into the wheel.
12. If you removed the front, outside road wheel, install
it at this time using the bolt and gasket removed
previously.
Note: Torque the bolt to 102 N-m (75 ft-lb) and
then clean, grease, and install the cap and snap ring
as instructed in the Checking and Greasing the Road
Wheels (page 31).
13. Install the tensioning bolt and jam nut.
14. Torque the tensioning bolt to 32.5 to 40 N-m (24 to 30
ft-lb) to tighten the track.
15. Ensure that the track deflects less than 0.6 to 1 cm (1/4
to 3/8 inch) when 20.6 kg (45 lb) of force is applied to
the track span.
Note: Adjust the torque on the tensioning bolt as
needed.
16. Tighten the jam nut.
17. Tighten the clamp bolts and torque to 102 N-m (75
ft-lb).
18. Lower the machine to the ground.
19. Repeat steps 3 through 18 to replace the other track.
Checking and Greasing the Road
Wheels
Service Interval: Every 250 hours
1. Remove the tracks; refer to Replacing the Tracks (page
30).
2. Remove the snap ring and cap from a road wheel
(Figure 48).
1. Road wheel
2. Road wheel cap
3. Check the grease under the cap and around the gasket
(Figure 48). If it is dirty, gritty, or depleted, clean out all
of the grease, replace the gasket, and add new grease.
31
Figure 48
3. Snap ring

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stx-2623208g

Table of Contents