Step 6.
Repeat the previous two steps to install the left outer rail to the upper EIA flange.
Step 7.
(Optional) If you need to ship the rack cabinet with servers installed or place the rack cabinet in a
vibration-prone area, install two M6 screws into the mounting flanges between the two rear pins on
both sides.
Figure 34. Installing the rear screws
Step 8.
Slide the SR250 into the rack:
Figure 35. Slide the SR250 into the rack.
Note: Make sure the top of the enclosure is facing right.
① Lift and align the server to the slide rails. Position the enclosure as shown, and slide it into the
rack.
② Press the release latches.
③ Push the enclosure all the way into the rack until it clicks into locked position.
Step 9.
(Optional) Open the rack release latches and tighten the screws to firmly secure the rail before
moving or placing the rack cabinet in a vibration-prone area.
30
ThinkSystem Micro DataCenter 6U 800mm Deep Rack Cabinet User Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinksystem micro datacenter 6u7d2p

Table of Contents