Download Print this page

Lenovo ThinkSystem DE2000H Installation And Setup Instructions

Hide thumbs Also See for ThinkSystem DE2000H:

Advertisement

Quick Links

ThinkSystem DE2000H, DE4000H, DE4000F,
DE6000H, DE6000F, DE120S, and DE240S Storage
Systems
Installation and Setup Instructions for 2U Enclosures
Machine Types: DE2000H (7Y70, 7Y71), DE4000H (7Y74, 7Y75),
DE4000F (7Y76), DE6000H (7Y78), DE6000F (7Y79),
DE120S (7Y63), and DE240S (7Y68)
Prepare for installation | Stage 1
Pre-setup
In the box
Shelf with drives installed
You provide
Phillips
flashlight, and ESD strap
HELPFUL LINKS
Lenovo Data Center Support Web site (worldwide):
http://datacentersupport.lenovo.com
Lenovo Data Center Support Web site (China):
http://support.lenovo.com.cn/EsWeb/
Create an account and register your hardware at datacentersupport.lenovo.com
Inventory cables and make note of the quantity.
Confirm that your location provides 100-240V AC power.
and rackmount hardware
2
2 screwdriver,
2U rack
space
Prepare for installation
1
Ethernet cables
if ordered
I/O cables
if ordered
A standard 19 in. (48.30 cm) rack to fit 2U
shelves of the following dimensions:
Shelf: 12-drive
2U
Height: 3.41 in. (8.68 cm)
Width: 17.6 in. (44.7 cm)
Depth: 21.1 in. (53.6 cm)
Max Weight: 63.9 lb (29.0 kg)
First Edition (September 2018)
© Copyright Lenovo 2018.
LIMITED AND RESTRICTED RIGHTS NOTICE: If data or software is delivered pursuant
to a General Services Administration (GSA) contract, use, reproduction, or disclosure
is subject to restrictions set forth in Contract No. GS-35F-05925.
LENOVO, LENOVO logo, and THINKSYSTEM are trademarks of Lenovo.
Microsoft and Windows are trademarks of the Microsoft group of companies.
All other trademarks are the property of their respective owners.
© 2018 Lenovo.
Install hardware
Cable storage
2
SAS cables
included only with
the drive shelves
Power cables
(two for each shelf)
Shelf: 24-drive
Height: 3.34 in. (8.48 cm)
Width: 17.6 in. (44.7 cm)
Depth: 19.0 in. (48.3 cm)
Max Weight: 60.5 lb (27.4 kg)
Complete system setup
and configuration
3
4
A supported browser
for the management
software

Advertisement

loading

Summary of Contents for Lenovo ThinkSystem DE2000H

  • Page 1 DE4000F (7Y76), DE6000H (7Y78), DE6000F (7Y79), DE120S (7Y63), and DE240S (7Y68) Prepare for installation | Stage 1 Create an account and register your hardware at datacentersupport.lenovo.com Inventory cables and make note of the quantity. Pre-setup Confirm that your location provides 100-240V AC power.
  • Page 2 Install the Rails Refer to the enclosed instructions for detailed information on how to install the rails. To download the instructions, go to Lenovo Data Center Support Web site. NOTE: Install hardware from the bottom of the rack up to the top to prevent the equipment from toppling over.
  • Page 3 Cable storage | Stage 3 Example A: DE6000H or DE6000F controller shelf with three Cable the Shelves DE120S/DE240S drive shelves in a standard SAS configuration. Cable the system according to your configuration. Examples are shown in this section. For more cabling options, see ThinkSystem DE-Series Hardware Installation and Maintenance Guide for 2U Enclosures.
  • Page 4 Controller Shelf. Highlight controller B, and then select Configure management ports to set the IP addresses for management port 1 on controller B. Do not configure management port 2. This port is reserved for Lenovo technical support. After you have configured controller B’s management port, repeat for controller A.