ABB RELION 670 Series Product Manual page 79

Hide thumbs Also See for RELION 670 Series:
Table of Contents

Advertisement

Bay control REC670 2.1 IEC
Scheme communication
Table 61. Scheme communication logic for distance or overcurrent protection ZCPSCH
Function
Scheme type
Operate voltage, Delta U
Operate current, Delta I
Operate zero sequence voltage,
Delta 3U0
Operate zero sequence current,
Delta 3I0
Co-ordination time for blocking
communication scheme
Minimum duration of a carrier
send signal
Security timer for loss of guard
signal detection
Operation mode of unblocking
logic
Table 62. Current reversal and weak-end infeed logic for distance protection ZCRWPSCH
Function
Detection level phase-to-
neutral voltage
Detection level phase-to-phase
voltage
Operate time for current
reversal logic
Delay time for current reversal
Coordination time for weak-
end infeed logic
Table 63. Scheme communication logic for residual overcurrent protection ECPSCH
Function
Scheme type
Communication scheme
coordination time
ABB
M16038-1 v11
Range or value
Off
Intertrip
Permissive UR
Permissive OR
Blocking
DeltaBlocking
(0–100)% of UBase
(0–200)% of IBase
(0–100)% of UBase
(0–200)% of IBase
(0.000-60.000) s
(0.000-60.000) s
(0.000-60.000) s
Off
NoRestart
Restart
M16039-1 v16
Range or value
(10-90)% of UBase
(10-90)% of UBase
(0.000-60.000) s
(0.000-60.000) s
(0.000-60.000) s
M16049-1 v9
Range or value
Permissive Underreaching
Permissive Overreaching
Blocking
(0.000-60.000) s
Accuracy
-
±5.0% of ΔU
±5.0% of ΔI
±10.0% of Δ3U0
±10.0% of Δ3I0
±0.5% ±10 ms
±0.5% ±10 ms
±0.5% ±10 ms
-
Accuracy
±0.5% of U
r
±0.5% of U
r
±0.2% or ±15 ms whichever is greater
±0.2% or ±15 ms whichever is greater
±0.2% or ±15 ms whichever is greater
Accuracy
-
±0.2% or ±20 ms whichever is greater
1MRK 511 361-BEN D
79

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rec670

Table of Contents