4.4.2 PV+Charger/PV+ESS+Charger

PV+Charger/PV+ESS+Charger Devices Under the Same Installer
1.
2.
3.
Method 1: In the Setup wizard, scan the QR code of the charger and select
Connect to existing plant.
Figure 4-10 Connecting to an existing plant
Method 2: On the Overview screen, tap Add device to connect to the charger.
Issue 02 (2023-01-13)
NO TE
If virtual meter networking is used, log in to the inverter connected to the Smart Dongle.
On the device commissioning screen, choose Settings > Communication configuration >
Dongle parameter settings, and set Modbus TCP to Enable (unrestricted). If an FE meter
is used, set Modbus TCP to Disable.
Connect the PV and ESS devices to the management system and create a
plant. For details, see the corresponding inverter quick guide or
App Quick
Guide.
Commission the charger and connect it to the management system. For
details, see
Device Commissioning
Connect the charger to the created PV plant.