Huawei PV+ESS+Charger Solution User Manual page 29

Table of Contents

Advertisement

PV+ESS+Charger Solution
User Manual
Parameter Settings (Installer)
When creating a PV plant, log in to the FusionSolar app as an installer,
the
Breaker Capacity on the quick settings screen.
Figure 2-7 Quick settings
Alternatively,
Capacity and Charging current if charger is disconnected from meter on the
maintenance screen.
Issue 02 (2023-01-13)
A meter must be configured for the dynamic charging power function. When
the charger detects that the meter is disconnected, it switches to the
minimum current charging mode. You can also set Charging current if
charger is disconnected from meter as needed.
charger, tap Setup Wizard on the home screen, and set Main Circuit
connect to the charger
Copyright © Huawei Technologies Co., Ltd.
as an installer, set Main Circuit Breaker
2 Solution Overview
connect to
23