● Delivering a reset, shutdown, or upgrade command to the solar inverters may
● Only professionals are allowed to set the grid parameters, protection
----End

6.3 Powering Off the System

Context
After the solar inverter powers off, the remaining electricity and heat may still
cause electric shocks and body burns. Therefore, put on protective gloves and
begin servicing the solar inverter five minutes after the power-off.
Procedure
Step 1 Run a shutdown command on the SmartLogger, or NMS.
Step 2 Turn off the AC switch between the solar inverter and the power grid.
Step 3 Turn off the DC switch at the bottom of the solar inverter.
Step 4 Turn off the DC switch between the PV string and the solar inverter if there is any.
----End
Issue 04 (2023-02-17)
NO TICE
cause power grid connection failure, which affects the energy yield.
parameters, feature parameters, and power adjustment parameters of the solar
inverters. If the grid parameters, protection parameters and feature parameters
are incorrectly set, the solar inverters may not connect to the power grid. If the
power adjustment parameters are incorrectly set, the solar inverters may not
connect to the power grid as required. In these cases, the energy yield will be
affected.