Troubleshooting - Huawei SUN2000-4.95KTL-JPL0 User Manual

Hide thumbs Also See for SUN2000-4.95KTL-JPL0:
Table of Contents

Advertisement

SUN2000-4.95KTL-JPL0
User Manual
Table 7-1 Maintenance list
Item
System
cleanliness
System
running status
Electrical
connections
Grounding
reliability
Sealing

7.2 Troubleshooting

Alarm severities are defined as follows:
Issue 04 (2023-02-17)
Check Method
Check the heat sink for foreign matter
or the overall health of the solar
inverter.
Check that the solar inverter is not
damaged or deformed.
● Check that cables are securely
connected.
● Check that cables are intact, and
that in particular, the parts touching
the metallic surface are not
scratched.
Check that the ground terminal and
ground cable are securely connected.
Check that all terminals and ports are
properly sealed.
Major: The solar inverter enters the shutdown mode and disconnects from the
power grid to stop generating power after a fault occurs.
Minor: Some components are faulty but the solar inverter can still connect to
the power grid and generate power.
Warning: The solar inverter output power decreases due to external factors.
Copyright © Huawei Technologies Co., Ltd.
7 System Maintenance
Maintenance
Interval
Once every twelve
months or every
time an abnormality
is detected
Once every twelve
months
The first inspection is
6 months after the
initial
commissioning. From
then on, the interval
can be 6 to 12
months.
Once every twelve
months
Once every twelve
months
52