SUN2000-4.95KTL-JPL0
User Manual
No.
8
6.2 Powering On the System
Prerequisites
Before turning on the AC switch between the solar inverter and the power grid,
check that the AC voltage on the power grid side of the AC switch is within the
specified range.
Before the equipment is put into operation for the first time, ensure that the
parameters are set correctly by professional personnel. Incorrect parameter
settings may result in noncompliance with local grid connection requirements and
affect the normal operations of the equipment.
If the DC is on and the AC is off, the solar inverter reports a Grid Loss alarm. The
solar inverter starts normally only after the fault is rectified.
Procedure
Step 1 Turn on the AC switch between the solar inverter and the power grid.
Step 2 Turn on the DC switch between the PV string and the solar inverter if there is any.
Step 3 Turn on the DC switch at the bottom of the solar inverter.
Step 4 For details about quick settings over the SmartLogger, see the
1-Out Smart AC Combiner Box Quick Guide.
Issue 04 (2023-02-17)
Item
Installation environment
NO TICE
NO TICE
Copyright © Huawei Technologies Co., Ltd.
6 System Commissioning
Acceptance Criteria
The installation space is proper, and
the installation environment is clean
and tidy.
SmartACBox 10-In
49