Preparing Cables - Huawei SUN2000-4.95KTL-JPL0 User Manual

Hide thumbs Also See for SUN2000-4.95KTL-JPL0:
Table of Contents

Advertisement

SUN2000-4.95KTL-JPL0
User Manual
● Stay away from the equipment when preparing cables to prevent cable scraps
● When routing PV cables, the positive and negative PV string cables should be

5.2 Preparing Cables

Figure 5-1 Solar inverter cable connection
Issue 04 (2023-02-17)
CA UTION
from entering the equipment. Cable scraps may cause sparks and result in
personal injury and equipment damage.
routed in different pipes to prevent cable damage and short circuits caused by
improper operations during construction.
NO TE
The cable colors shown in the electrical connection diagrams provided in this chapter are
for reference only. Select cables in accordance with local cable specifications (green-and-
yellow cables are only used for grounding).
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
35

Advertisement

Table of Contents
loading

Table of Contents