Etc Learn Procedure - Polaris RZR XP Turbo Service Manual

2017-2018
Table of Contents

Advertisement

r
4. Remove the four bolts
to intake plenum.
5. Remove the ETC housing and gasket
plenum.
6. Reverse these steps for installation. Torque the ETC
housing retaining bolts, intake boot clamps and body
fasteners to specification.
TORQUE
ETC Housing Retaining Bolts:
7 ft-lb (10 Nm)
Intake Boot Clamp:
49 in-lb (6 Nm)
Body Fasteners:
8 ft-lb (11 Nm)
9928491 R04 - 2017-2018 RZR XP Turbo / XP4 Turbo Service Manual
© Copyright Polaris Industries Inc.
retaining the ETC housing
t
from intake

ETC LEARN PROCEDURE

IMPORTANT
This procedure MUST be performed on the vehicle
whenever the ECU is replaced or reflashed or the
throttle body is replaced.
1. After the reflash / ECU replacement / throttle body
change, leave the key on (engine not running) for 60
seconds. Do NOT crank the engine during this time.
2. Turn the key off and wait 3 minutes. During this time,
the ECU will write values into memory and then
completely shut down.
3. Turn key back on and start the vehicle. The vehicle
should operate normally.
4. If the procedure was interrupted at any time, start
back at step 1.
EFI / FUEL SYSTEM
4
4.35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzr xp4 turbo

Table of Contents