FRONT HALF SHAFT INSTALLATION
q
1. Install new spring ring
anti-seize compound to the splines
2. Align splines of drive shaft with front gearcase and
reinstall the drive shaft. Use a rubber mallet to tap on
the outboard end of the drive shaft if necessary
3. Install drive shaft into the front bearing carrier.
4. Install the upper and lower ball joint ends into the
front bearing carrier.
9926814 R08 -
Manual
© Copyright Polaris Industries Inc.
on drive shaft. Apply an
w
.
2015-2016 RZR 900
5. Install new pinch bolts
specification.
TORQUE
Ball Joint Pinch Bolts:
42 ft-lb (57 Nm)
6. Apply Anti-Seize to drive shaft axle splines.
7. Install front wheel hub assembly
and hand tighten the castle nut. Install washers with
domed side out.
2016 RZR S 1000 Service
FINAL DRIVE
e
and nuts. Torque to
r
t
, cone washers
,
7.11
7