HEATER BLOWER INSTALLATION - ASSEMBLY Continued
24. Connect the heater hoses from the cab, one to the connector
on the thermostat housing and the other to the T connector
in the bottom hose. Use the hose clips supplied. Refer to
Fig 85 and Fig 86.
25. Tie hoses back to prevent them from chafing and ensure that
they are routed away from rotating parts and exhaust
components. Refer to Fig 86.
26. Refit the roof.
27. Refill the engine cooling system with the correct mix of
water and antifreeze. Refer to machine manual for details.
28. Start the engine.
29. Open the hot water valve in the cab and allow the engine to
run at half throttle until warm air comes from the heater.
Refer to Fig 58 (L) on page 49.
30. Check all connections for leaks and tighten where necessary.
31. Check the engine coolant level and top up if necessary.
HEATER BLOWER INSTALLATION - MAINTENANCE
1. Check all connections for leaks once a year and tighten if
necessary.
HEATER BLOWER INSTALLATION - ELECTRICAL WIRING
Fig 87
Issued: 01.04.11
Approved:
Fig 85
Fig 86
Mod. No.
5060358
Sheet 57 of 64
Part No. 111-4431 (A)