Installing A Mat - Toro Sand Pro 3040 Manual

Drag mat carrier system
Hide thumbs Also See for Sand Pro 3040:
Table of Contents

Advertisement

Figure 4
1. Chain
2. Spacer
3. Bolt (3/8 x 2-1/2 inches)
3. Thread a shackle through the bottom link of each chain
on the lift arm
(Figure
Figure 5
1. Chain
2. Shackle
4. Secure each shackle to the drag-mat-carrier assembly
as illustrated in
Figure 5
inches) and a cotter pin.
Note: For proper operation of the attachment, the
chains must be slack when the drag mat is in the
lowered (operating) position.
4. Washer (3/8 x 7/8 inch)
5. Locknut (3/8 inch)
5).
3. Clevis pin (3/8 x 1-1/2
inches)
4. Cotter pin
using a clevis pin (3/8 x 1-1/2
2

Installing a Mat

Parts needed for this procedure:
1
Steel mat (not included in this kit, order separately)
Coconut-fiber mat (not included in this kit, order
1
separately)
11
Mat retainer
11
Bolt (3/8 x 1 inch)
11
Flange nut (3/8 inch)
Procedure
1. Line up 1 edge of the mat with the rear edge of the
carrier.
Important: If you are installing the steel mat,
position the mat so that the tabs along the
outside edge face rearward when the installation
is complete. This orientation prevents the tabs
from bending and other subsequent damage from
occurring.
1. Tabs facing rearward
5
Figure 6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sand pro 5040Infield pro 3040Infield pro 504008756

Table of Contents