NEC NEAX 2400 IPX Manual page 186

Fusion network
Hide thumbs Also See for NEAX 2400 IPX:
Table of Contents

Advertisement

B
H U B -H U B C ab le C o nn e ctio n T es t
1 ) Tu rn O N th e M N T sw itch o f t h e F C H car ds whic h a r e co nnect e d
to th e b o th H U B card s.
2 ) M ak e su re th a t syste m m e ssa ge (23 -W ) "F C H A lte rn ate R o uting
(sta rt)" is d isp la ye d fo r e a ch FC H .
3 ) T u rn O N th e M B ke y o n the bo th H U B ca rd s.
4 ) U n p lug an d p lu g th e m o d u la r co nn e cto r a fe w tim es a t e a ch co n n e -
cto r sin ce th e co n ne ctio n m a y b e a p o or co nta ct.
5 ) If t he above proce d u r e d o e s not r e s ult i n n or m a l operatio n , perf or m
th e co n d u ctive te st o f t h e 1 0 B A S E-T ca b l e.
HU B (PA-M 96)
: 10 B AS E -T cable
C
H U B -L A N I C a b le C o nn e ctio n T est
1) Turn O N the M N T3 sw itch of the F C H ca rd s w h ic h are co nnected
to th e b oth H U B ca rd s.
2 ) M a ke su re th at syste m m e ssa g e (2 3 -W ) "FC H A ltern a te R o u tin g (start)"
is disp lay ed fo r e a ch F C H .
3) Turn O N the M B ke y on the H U B ca rd .
4 ) U n plu g a n d p lu g th e m o d ula r co n n e cto r a fe w tim e s a t e a ch co n ne ctor
since th e co n n ection m ay b e a p o o r co n ta ct.
5 ) If th e a b o v e p r o c edur e d oes n ot r e s ult i n nor m a l o p e r ati o n , perfor m t he
co nd u ctive te st of th e 1 0 BASE- T c a b l e.
When a HUB card is placed in make-busy, all BASE-T interfaces connected to the
WARNING:
HUB card become inoperative.
FC H (PA -FC H A)
H U B (P A-M 96)
M B
M B
m odular
connector
B
to LA N I
C
(P Z -P C 19)
Figure 7-13 How to Check 10 BASE-T Cables
NDA-24299
23-S FCH Failure Notification (Detection)
D TI(PA -24D TR )
M B
M B
M NT 3
M N T
A
H U B - F C H C a b le C o n n ec tion T e st
1) T u rn O N th e M N T 3 sw itch on th e F C H c ard . (m a ke -b u sy-re qu e st)
2) M a ke su re tha t system m e ssa g e (2 3 -W ) "FC H
A lte rna te R ou tin g (sta rt)" is d isp la ye d.
3) Tu rn O N th e M B ke y o n th e FC H ca rd .(m ak e-b u sy)
A
4) Tu rn O N th e M B ke y o n th e H U B ca rd .(m a ke -b u sy)
5) U np lu g a nd plu g the m o du la r co n n ecto r a few
tim e s a t ea ch con n e cto r sin ce th e co n ne ctio n m a y
b e a p o o r co n ta ct.
6) If th e a b o ve p ro ce du re d o e s n o t re sult in n orm al op e ra tio n,
pe rform th e co n d u ctive test o f the 10 B A S E -T ca b le .
m odular
connector
10 BAS E-T
U nplug and plug the m odular connector
TROUBLESHOOTING
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
O P E
M B
2
CHAPTER 7
Page 171
Revision 1.0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents