After Reassembly - GE Dash Port 2 Service Manual

Table of Contents

Advertisement

Join the Top and Bottom Housings

After Reassembly

Recommended Electrical Safety Tests and Checkout Procedures
Replacement Procedure
Top Housing Assembly FRU
Connector Assembly FRU
PCB FRU
Revision A
Part Lists, Drawings, and Replacement: Disassembly/Assembly of FRUs
029A
After reassembling the docking station, ALWAYS complete ALL of the
checkout procedures, electrical safety tests, and regular maintenance
procedures identified and described in this service manual.
Electrical Safety Tests
"Power Outlet Test"
"Ground (Earth) Integrity"
"Ground (Earth) Wire Leakage Current
Tests"
on page 4-10.
"Enclosure Leakage Current Test"
page 4-11.
Dash Port 2 Docking Station
2000966-138
1. Insert the locking lever spring into the spring
opening.
2. Slide and hold the security lever in the unlock
position (far left) while inserting the locking
lever pin into the locking assembly.
3. Release the security lever and place the top and
bottom housing pieces together.
4. Hold onto both housings and turn the unit over
and install the six screws into the bottom
housing.
5. See
"After Reassembly"
the electrical safety tests and checkout
procedures you must complete.
Checkout Procedures
on page 4-7.
"Docking Station Power-up Tests"
on page 4-8.
page 4-14.
"Network Test"
"Auxiliary Port Test"
on
"Remote Display (Option) Test"
page 4-16.
on page 6-25 to identify
on
on page 4-15.
on page 4-15.
on
6-25

Advertisement

Table of Contents
loading

Table of Contents