Bushing Adaptor Circuit Integrity Test Record; Required Material - GE Kelman DGA 900 Plus Installation & Commissioning Manual

Transformer monitoring system
Table of Contents

Advertisement

9.8

Bushing Adaptor Circuit Integrity Test Record

The Bushing Adaptor Circuit Integrity Test is to be performed upon installation, after
periodic transformer maintenance or any bushing repair activities.

9.8.1 Required Material

Antenna Analyser, RigExpert AA-170 model (>170 MHz)
UHF to BNC adaptor
Coax cable with BNC connector at one end and clips at the other end as shown in
Figure 9-25.
Figure 9-25: Coax BNC to clips cable
Two small flat screwdrivers or a 2-pin connector and a release key as shown in Figure
9-26.
Figure 9-26: Two-pin connector and release key
USB cable with type B connector
PC with AntScope software installed
50  wire-through resistor
Ohmmeter
MA-041 – DGA 900 Plus - Installation & Commissioning Manual - Rev 1.1