Huawei FusionCol8000-E240 Quick Manual page 8

Modular indirect evaporative cooling system
Hide thumbs Also See for FusionCol8000-E240:
Table of Contents

Advertisement

4
(Optional) Installing Electric Heater Components
FDC Scenario
1.
Remove the air exhaust side panel.
2.
Install the electric heater controller.
3.
Route the heating belt and
temperature sensor probe through
the condensate drainage hole, wrap
the heating belt around the
condensate drainpipe, and ensure
that the temperature sensor probe is
closely attached to the drainpipe.
(1) Sheet metal
4.
Connect the cable.
5.
Use silicone sealant to seal the gaps between the heating belt, cables, pipe, and wall panels.
6.
Use thermal insulation foam to wrap the heating belt and temperature sensor probe around
the pipe.
7.
Press the SET button on the electric heater controller for 2 seconds. Within 10 seconds, press
and
to set the parameter to 5°C, and press the SET button to save the settings.
The cable length is about 11 m, and
the cable specification is 3 x 1.5
2
mm
.
(2) Electric heater controller
7
Building Scenario
1.
Open the maintenance door for the
electric heater controller to be
installed.
2.
Install the electric heater controller.
3.
Route the electric heating belt and
temperature sensor probe through the
condensate drainage hole, wrap the
electric heating belt around the
condensate drainpipe, and ensure that
the temperature sensor probe is
closely attached to the drainpipe.
(3) Exhaust side panel

Advertisement

Table of Contents
loading

Table of Contents