Huawei FusionCol8000-E240 Quick Manual page 12

Modular indirect evaporative cooling system
Hide thumbs Also See for FusionCol8000-E240:
Table of Contents

Advertisement

Sealing and Pipe Anti-freezing Protection
1.
Remove the paper protective
film from the sealing putty.
2.
Seal the gaps between the
water pipes and the equipment
using sealing putty after the
pipes are correctly connected.
(1) Paper protective film
(2) Sealing putty
4.
Wrap the electric heating belt (with spacing of at least 27 mm) and then wrap the
thermal insulation foam. The thermal insulation foam must withstand a temperature
above 200 ° C.
3.
Condensate drainpipes and water refill
pipes may freeze and thereby be blocked
or crack in low-temperature areas. Take
anti-freezing measures for the pipes.
(1) Trap
(2) Electric heating belt
(3) Water refill pipe
(4) Drainpipe (The end needs to be
connected to the utility drainpipes.)
(5) Soil
11

Advertisement

Table of Contents
loading

Table of Contents