Huawei FusionCol8000-E240 Quick Manual page 10

Modular indirect evaporative cooling system
Hide thumbs Also See for FusionCol8000-E240:
Table of Contents

Advertisement

Drainpipe Routing
(Pipes Routed from the
Bottom)
(1) Main drainpipe
(2) Water trap
Drainpipe
Routing (Pipes
Routed from
the End)
Pipe Position and Relative Position Dimensions
Building Scenario
9
Unit: mm

Advertisement

Table of Contents
loading

Table of Contents