Huawei NetCol8000-A Series Quick Manual page 17

In-room air cooled smart cooling product
Hide thumbs Also See for NetCol8000-A Series:
Table of Contents

Advertisement

This wiring method applies to the smart module scenarios or other scenarios with LAN switches
regardless of teamwork networking.
7.10
(Optional) Installing the Cap (Applicable to Upflow Units)
It takes two persons to install the cap using a 2 m step ladder.
Before installing the cap, attach the thermal insulation foam in the accessories to the top beam
of the smart cooling product, and ensure that the reserved holes in the thermal insulation foam
are aligned with the holes in the beam. Check that the cap is intact and free from scratches, that
the sheet metal is not bent, and that the screws are secure.
1. Remove the cap front panel using a Phillips
screwdriver. Place the cap on the top of the cabinet.
3. Secure the cap front panel to the frame, and
adjust the angle of the front panel blade.
2. Secure the left and right sides of the cap
using six M5 screws and the front and
rear of the cap using four M5. screws.
17

Advertisement

Table of Contents
loading

Table of Contents