Download Print this page

Important Instructions - ABB 180 Comfort Operating Instructions Manual

I-bus eib powernet eib up watchdog

Advertisement

Important instructions

GB
When planning and erecting electrical systems the
relevant standards and regulations applicable in the
country where the equipment is set up and operated
must be duly observed.
Work on the 230V-mains system and EIB bus must
exclusively be performed by trained electrical
personnel. Laying and connection of the bus line as
well as application devices must be in conformity
with applicable guidelines specified in the EIB Manu-
al of the European Installation Bus Association (EIBA).
Please note that the UP watchdogs are not meant
to function as burglary or invasion alarm systems
since they are not adequately protected against
acts of sabotage as prescribed.
Please make sure the ambient conditions suited for
the safety class and permissible operating tempe-
rature (see "Technical Data") are met.
When mounting the UP watchdog 180 use a suitable
®
UP bus coupler (ABB ibus
EIB) or UP mains coupler
®
(ABB Powernet
EIB) – hereinafter collectively termed
UP coupler.
The devices are to be programmed using ETS2
(version 1.1 or higher) or via Power-Project (Version
3.0 or higher).

Hide quick links:

Advertisement

loading