Calibration and adjustments
Refer to:
8-6-4-4
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws that you removed earlier have been installed.
2.) If finished, connect cables and Probes removed earlier.
3.) Power up the LOGIQ E9 to verify that it operates as intended.
8-6-4-5
Functional Checks
Perform the following functional tests to confirm the LOGIQ E9 is operational before returning the
LOGIQ E9 to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all required tests and is ready for use.
. 2
EV
Section 6-2 "Monitor adjustments" on page 6-1
Table 8-81
See:
Section
Functional Checks
4-2-2
Power ON/Boot Up
4-2-3
Power shut down
4-2-4
Top Console position adjustment
4-3-5
B-Mode Checks
4-3-7
System CFM and PWD Checks
6-2-3
Monitor Adjustment Procedure
Chapter 8 Replacement procedures
for LCD Monitor calibration instructions.
V2 Arm Adapter replacement Functional Checks
5573152-100, Rev. 2. Leakage Current
measured at (record the value) and meets
allowable limits. Equipment passed all required
LOGIQ E9 S
ERVICE
Debrief Script
LOGIQ E9 Service Manual, Direction
checks and is ready for use.
M
ANUAL
8 - 133