GE LOGIQ E9 Service Manual page 387

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
Table 8-65
5.
NOTE: To ensure the Monitor is installed
level with the system and before
re- installing the Cable Cover:
MAKE SURE:
- the LOGIQ E9 is on a level surface,
- the wheels are in-line,
- the Monitor Arm Lock is LOCKED.
Check that the LOGIQ E9 is level.
Place a level on the monitor (as shown).
If any adjustment is required, loosen the
four mounting screws and make the
adjustment. Re-tighten the four screws
after the adjustment.
NOTE: If a level is not available, make sure
the Monitor is as square as possible with
the LOGIQ E9, visually.
. 2
EV
Monitor installation - R5.x and later (Ergotron)
Steps
Chapter 8 Replacement procedures
LOGIQ E9 S
ERVICE
Corresponding Graphic
M
ANUAL
8 - 103

Advertisement

Table of Contents
loading

Table of Contents