GE LOGIQ E9 Service Manual page 408

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
Table 8-75
8.
OLED Monitor and Bulkhead Board
P/N 5492372.
Connect the Monitor cables; the Power/
USB Cable (P3) and the HDMI (P10). See
Bulkhead layout in Step 7 for reference.
Go to Step 10.
9.
After plugging in the Monitor Cable, bend
the cable as shown, pull with your index
finger and push with your thumb. The "S"
bend allows the cable to flex in the up
direction when the Bulk Head Cover is
installed.
10. Install the Bulkhead Cover.
11. Re-install the Monitor.
12. Perform Functional Checks. See:
and
8 - 124
. 2
EV
Monitor Arm assembly (Ergotron) installation - R5 and later production
Steps
8-6-3-6 "Functional Checks" on page
Section 8-6 - Replacing Top Console Parts
Corresponding Graphic
OLED Monitor - R6 and later
8-6-3-4 - Calibration and
8-125.
LOGIQ E9 S
ERVICE
R5 only
adjustments,
8-6-3-5 - Verification
M
ANUAL

Advertisement

Table of Contents
loading

Table of Contents