Huawei FusionDC1000A Quick Manual page 26

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:

Advertisement

No.F004 Fire Extinguishing Device Installation Position Diagram
POWER
Bottom of
DB-1
entry
Bottom of
UPS5000E-A1
SMDB-A1
entry
800K
1250A
Power
Power
Bypass
Bypass
Power
cabinet
cabinet
cabinet
cabinet
Bottom of
cabinet
entry
Li Batt.-
Li Batt.-
Li Batt.-
Li Batt.-
Li Batt.-
Li Batt.-
Li Batt.-
Dehumidifier-1
A1
-A2
-A3
-A4
-A5
-A6
-A7
80AH
80AH
80AH
80AH
80AH
80AH
80AH
BBB-1250A
BBB-1250A
-A1
-A2
Install two 12 V/7.2Ah batteries for the ECP .
BBB-1250A
BBB-1250A
-B1
-B2
Bottom of
UPS5000E-B1
Li Batt.-
Li Batt.-
SMDB-B1
entry
800K
-B7
-B8
1250A
Power
Bypass
Bypass
80AH
40AH
Bottom of
cabinet
cabinet
cabinet
entry
Li Batt.-
Li Batt.-
Li Batt.-
Li Batt.-
Li Batt.-
Li Batt.-
Li Batt.-
-A8
-B1
-B2
-B3
-B4
-B5
-B6
B
Extinguishant Control Panel-1
Bottom of
80AH
80AH
80AH
80AH
80AH
80AH
80AH
entry
Install the gas cylinder
The pneumatic switch is
preinstalled. Connect the flexible
hose on the pneumatic switch to the
cylinder valve onsite.
Bind the solenoid valve to the
wall and install it on the cylinder
valve onsite.
Step 1 Determine the fire cylinder installation position based on the fire cylinder installation position
diagram.
Step 2 Move the fire cylinder using a pallet truck to a position near the pre-fab. module door closest
to the installation position.
Step 3 Untie the preconfigured straps at the installation position of the fire cylinder.
Step 4 Move the fire cylinder to the installation position and secure it.
Step 5 Install the threaded adapter and high-pressure hose.
NOTICE:
Install the threaded adapter and then the high-pressure
hose.
Wrap the threads with sealing tape to ensure air tightness.
Installing Fire Cylinders
(1) Threaded adapter
(2) High-pressure hose
Installing Extinguishant Control Panel