5. If cables are not labeled, label them before removing them from the server.
6. Remove all cables from the server, and remove the server from the rack.
7. Remove the rail mounts from the old server, and install them on the new server.
8. Remove the battery from the old server, and install it in the new server.
9. Remove the bezel from the old server, and install it on the new server.
10. Insert the new server into the rack, and connect the power cords to the power
supplies.
Configuring the replacement servers
Before you begin
Obtain the necessary IP addresses to be used for the replacement server. Servers
shipped from the factory have not yet had the nas-preconfig script run on them, so a
replacement server will not have any IP addresses pre-configured for your use. You need
IP addresses for the following:
Eth1 (cluster IP)
■
Eth1 (testhost private IP)
■
Eth0 (testhost external IP)
■
192.0.2.200/24 eth1 (cluster IP)
■
192.0.2.2/24 eth1 (testhost private IP)
■
192.168.4.120/24 eth0 (testhost external IP, which might vary)
■
On a replacement server:
Hitachi NAS Platform and Hitachi Unified Storage Series 4000 Hardware Reference
Labels
Note: Do not make any other cable connections at this time.
Appendix A: Server replacement procedures
Configuring the replacement servers
Ports
Connections
1
Storage or FC switches
2
Storage or FC switches
3
Storage or FC switches
4
Storage or FC switches
0
Customer facing management network
1
Private management Ethernet network
120